Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,491
matching recommendationsSIC | 372 | Aircraft And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0166 # 07 Y:2003 | 07 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,000 | $68,560 | Implemented |
UU0053 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,354 | $4,100 | Not Implemented |
UU0053 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,131 | $55 | Not Implemented |
UU0053 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,710 | $2,000 | Not Implemented |
UU0053 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,112 | $70,635 | Not Implemented |
UU0053 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,869 | $2,340 | Implemented |
UU0053 # 06 Y:2003 | 06 | 2003 | INSTALL TURBULATORS | $2,610 | $1,572 | Not Implemented |
UU0050 # 01 Y:2003 | 01 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,216 | $5,500 | Not Implemented |
UU0050 # 02 Y:2003 | 02 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,838 | $2,000 | Not Implemented |
UU0050 # 03 Y:2003 | 03 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,640 | $4,342 | Not Implemented |
UU0050 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,075 | $420 | Not Implemented |
UU0050 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $177 | $390 | Not Implemented |
UU0050 # 06 Y:2003 | 06 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,400 | $0 | Not Implemented |
UU0050 # 07 Y:2003 | 07 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,684 | $895 | Not Implemented |
UU0050 # 08 Y:2003 | 08 | 2003 | OPTIMIZE PLANT POWER FACTOR | $5,144 | $9,200 | Not Implemented |
UD0676 # 01 Y:2003 | 01 | 2003 | OPTIMIZE PLANT POWER FACTOR | $19,216 | $6,000 | Implemented |
UD0676 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,997 | $5,000 | Not Implemented |
UD0676 # 03 Y:2003 | 03 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,900 | $0 | Not Implemented |
UD0676 # 04 Y:2003 | 04 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,015 | $25,000 | Implemented |
UD0676 # 05 Y:2003 | 05 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,147 | $2,000 | Implemented |
UD0676 # 06 Y:2003 | 06 | 2003 | DISCONNECT BALLASTS | $2,363 | $225 | Not Implemented |
UD0676 # 07 Y:2003 | 07 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,739 | $500 | Not Implemented |
UD0676 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,230 | $200 | Implemented |
LM0063 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,244 | $140 | Implemented |
LM0063 # 02 Y:2003 | 02 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,129 | $0 | Implemented |