IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,485

matching recommendations
Reset
SIC 372 Aircraft And Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0656 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $659 $659 Not Implemented
OK0655 # 01 Y:2003 01 2003 INSTALL SET-BACK TIMERS $21,416 $543 Not Implemented
OK0655 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,168 $1,300 Not Implemented
OK0655 # 03 Y:2003 03 2003 REPLACE BOILER $45,804 $53,815 n/a
OK0655 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $38,818 $30,499 Not Implemented
OK0655 # 05 Y:2003 05 2003 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,749 $25,000 Not Implemented
AM0426 # 01 Y:2003 01 2003 REUSE RAGS UNTIL COMPLETELY SOILED $5,330 $0 Not Implemented
AM0426 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,310 $1,460 Not Implemented
AM0426 # 03 Y:2003 03 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,950 $0 Not Implemented
AM0426 # 04 Y:2003 04 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,420 $0 Not Implemented
AM0426 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $820 $500 Implemented
IA0302 # 01 Y:2002 01 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,423 $6,500 Not Implemented
IA0302 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,323 $120 Not Implemented
IA0302 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $307 $333 Not Implemented
IA0302 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $409 $36 Not Implemented
IA0302 # 05 Y:2002 05 2002 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $13,521 $5,000 Not Implemented
IA0302 # 06 Y:2002 06 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,236 $665 Implemented
MA0519 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,771 $13,775 Not Implemented
MA0519 # 02 Y:2002 02 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,181 $2,500 Not Implemented
MA0519 # 03 Y:2002 03 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,294 $6,675 Not Implemented
MA0519 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,344 $450 Implemented
MA0519 # 05 Y:2002 05 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,240 $500 Implemented
MS0212 # 01 Y:2002 01 2002 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $1,698 $1,707 Not Implemented
MS0212 # 02 Y:2002 02 2002 USE SYNTHETIC LUBRICANT $1,158 $760 Not Implemented
MS0212 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $982 $477 Implemented