Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
588
matching recommendationsSIC | 3724 | Aircraft Engines And Engine Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0004 # 04 Y:2007 | 04 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,933 | $500 | Not Implemented |
DL0004 # 05 Y:2007 | 05 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,506 | $33,000 | Not Implemented |
DL0004 # 06 Y:2007 | 06 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $93,700 | $130,000 | Not Implemented |
DL0004 # 07 Y:2007 | 07 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,203 | $8,830 | Not Implemented |
NC0354 # 01 Y:2007 | 01 | 2007 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $39,874 | $45,600 | Not Implemented |
NC0354 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $32,774 | $100,000 | Not Implemented |
NC0354 # 03 Y:2007 | 03 | 2007 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $65,972 | $100,000 | Not Implemented |
NC0354 # 04 Y:2007 | 04 | 2007 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $35,076 | $2,000 | Not Implemented |
NC0354 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,375 | $100 | Implemented |
NC0354 # 06 Y:2007 | 06 | 2007 | ADJUST BURNERS FOR EFFICIENT OPERATION | $7,411 | $2,000 | Implemented |
NC0354 # 07 Y:2007 | 07 | 2007 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,714 | $1,000 | Not Implemented |
NC0354 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,936 | $2,559 | Implemented |
TA0131 # 01 Y:2006 | 01 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $18,180 | $16 | Implemented |
TA0131 # 02 Y:2006 | 02 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,225 | $60 | Not Implemented |
TA0131 # 03 Y:2006 | 03 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,180 | $630 | Not Implemented |
TA0131 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,450 | $120 | Implemented |
TA0131 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,400 | $0 | Implemented |
MA0607 # 01 Y:2006 | 01 | 2006 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $46,963 | $0 | Not Implemented |
MA0607 # 02 Y:2006 | 02 | 2006 | REDUCE VENTILATION AIR | $45,943 | $10,400 | Not Implemented |
MA0607 # 03 Y:2006 | 03 | 2006 | BURN A LESS EXPENSIVE GRADE OF FUEL | $14,261 | $5,500 | Not Implemented |
MA0607 # 04 Y:2006 | 04 | 2006 | REDUCE VENTILATION AIR | $12,889 | $1,700 | Not Implemented |
MA0607 # 05 Y:2006 | 05 | 2006 | USE UTILITY CONTROLLED POWER MANAGEMENT | $12,223 | $14,000 | Not Implemented |
MA0607 # 06 Y:2006 | 06 | 2006 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $10,577 | $1,870 | Not Implemented |
MA0607 # 07 Y:2006 | 07 | 2006 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,860 | $3,500 | Not Implemented |
UD0734 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,890 | $19,500 | Implemented |