IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

588

matching recommendations
Reset
SIC 3724 Aircraft Engines And Engine Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0384 # 02 Y:2011 02 2011 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,680 $611 Not Implemented
MS0384 # 03 Y:2011 03 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,101 $13,781 Not Implemented
LE0321 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,801 $8,300 Implemented
LE0321 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,323 $1,360 Implemented
LE0321 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,529 $30 Implemented
LE0321 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,115 $800 Not Implemented
LE0321 # 05 Y:2011 05 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,996 $7,200 Not Implemented
LE0321 # 06 Y:2011 06 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,196 $165 Implemented
LE0321 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,464 $60,000 Not Implemented
LE0321 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,803 $18,000 Implemented
OK0802 # 01 Y:2010 01 2010 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,017 $6,215 Not Implemented
OK0802 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,400 $1,550 Implemented
OK0802 # 03 Y:2010 03 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,477 $2,599 Not Implemented
OK0802 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $1,998 $13,149 Implemented
OK0802 # 05 Y:2010 05 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $11,414 $51,875 Implemented
OK0802 # 06 Y:2010 06 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,918 $2,775 Implemented
OK0802 # 07 Y:2010 07 2010 USE DEMAND CONTROLLER OR LOAD SHEDDER $30,411 $45,000 Implemented
OK0802 # 08 Y:2010 08 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $23,800 $15,600 Implemented
OK0802 # 09 Y:2010 09 2010 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,625 $0 Implemented
OK0802 # 10 Y:2010 10 2010 COMBINE UTILITY METERS $936 $175 Implemented
BD0379 # 01 Y:2010 01 2010 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $43,359 $156,000 Not Implemented
BD0379 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $12,675 $5,775 n/a
BD0379 # 03 Y:2010 03 2010 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $10,691 $14,000 Not Implemented
BD0379 # 04 Y:2010 04 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,550 $8,550 Not Implemented
BD0379 # 05 Y:2010 05 2010 USE SYNTHETIC LUBRICANT $1,393 $300 Not Implemented