Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
717
matching recommendationsSIC | 3728 | Aircraft Parts And Equipment, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0939 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $1,588 | $1,013 | Implemented |
UD0939 # 08 Y:2016 | 08 | 2016 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,699 | $315 | Implemented |
MZ0188 # 01 Y:2015 | 01 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $19,385 | $0 | Implemented |
MZ0188 # 03 Y:2015 | 03 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,249 | $1,000 | Implemented |
MZ0188 # 04 Y:2015 | 04 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,811 | $0 | Implemented |
BD0465 # 02 Y:2015 | 02 | 2015 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $11,490 | $62,000 | Implemented |
BD0465 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $972 | $3,705 | Implemented |
BD0465 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $906 | $1,200 | Implemented |
BD0465 # 05 Y:2015 | 05 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $837 | $648 | Implemented |
BD0465 # 06 Y:2015 | 06 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $330 | $800 | Implemented |
BD0465 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $256 | $305 | Implemented |
BD0465 # 08 Y:2015 | 08 | 2015 | CLEAR AND RENT EXISTING SPACE | $71,910 | $2,000 | Implemented |
OK0915 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $58,176 | $103,015 | Implemented |
OK0915 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,867 | $20,538 | Implemented |
OK0915 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,060 | $24,180 | Implemented |
OK0915 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,077 | $6,900 | Implemented |
OK0915 # 07 Y:2015 | 07 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $674 | $382 | Implemented |
OK0915 # 11 Y:2015 | 11 | 2015 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,720 | $3,060 | Implemented |
MI0278 # 03 Y:2015 | 03 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $45,923 | $79,106 | Implemented |
MI0278 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,431 | $9,248 | Implemented |
MI0278 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,235 | $1,660 | Implemented |
MI0278 # 06 Y:2015 | 06 | 2015 | INSTALL OCCUPANCY SENSORS | $4,706 | $2,901 | Implemented |
MI0278 # 07 Y:2015 | 07 | 2015 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,804 | $480 | Implemented |
MI0278 # 08 Y:2015 | 08 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,391 | $8,360 | Implemented |
MI0278 # 09 Y:2015 | 09 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,181 | $40 | Implemented |