IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

707

matching recommendations
Reset
SIC 3728 Aircraft Parts And Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0436 # 08 Y:2011 08 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,009 $1,000 Implemented
WV0423 # 04 Y:2011 04 2011 REPAIR AND ELIMINATE STEAM LEAKS $1,472 $626 Implemented
WV0423 # 05 Y:2011 05 2011 INSTALL TIMERS AND/OR THERMOSTATS $1,173 $2,443 Implemented
WV0423 # 06 Y:2011 06 2011 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $1,041 $1,000 Implemented
WV0423 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $521 $89 Implemented
WV0423 # 08 Y:2011 08 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $428 $183 Implemented
WV0423 # 09 Y:2011 09 2011 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $343 $177 Implemented
WV0423 # 12 Y:2011 12 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $272 $139 Implemented
WV0420 # 03 Y:2011 03 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,569 $14,510 Implemented
WV0420 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $4,500 $4,500 Implemented
WV0420 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $764 $480 Implemented
MI0194 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,336 $80,304 Implemented
MI0194 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,923 $1,210 Implemented
MI0194 # 06 Y:2010 06 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,190 $2,000 Implemented
MI0189 # 02 Y:2010 02 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,451 $2,000 Implemented
MI0189 # 03 Y:2010 03 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,033 $10,500 Implemented
MI0189 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,161 $7,164 Implemented
MI0189 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,029 $1,210 Implemented
MS0367 # 01 Y:2010 01 2010 COVER OPEN TANKS $79,614 $15,421 Implemented
OK0790 # 03 Y:2010 03 2010 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $32,076 $0 Implemented
OK0790 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,871 $1,750 Implemented
OK0790 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,627 $20,203 Implemented
OK0790 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $245 $13 Implemented
OK0790 # 11 Y:2010 11 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $334 $418 Implemented
MI0187 # 01 Y:2010 01 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $24,507 $1,800 Implemented