Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 3728 | Aircraft Parts And Equipment, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1066 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,952 | $600 | Implemented |
UD1066 # 02 Y:2023 | 02 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,630 | $1,415 | Implemented |
UD1066 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $671 | $1,639 | Implemented |
CW0120 # 02 Y:2021 | 02 | 2021 | INSTALL BACK-UP EQUIPMENT | $32,054 | $93,000 | Implemented |
CW0120 # 01 Y:2021 | 01 | 2021 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $30,000 | $70,084 | Implemented |
CW0120 # 08 Y:2021 | 08 | 2021 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $217 | $86 | Implemented |
CW0120 # 07 Y:2021 | 07 | 2021 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,000,000 | $122,000 | Implemented |
CW0120 # 06 Y:2021 | 06 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $899 | $0 | Implemented |
CW0120 # 05 Y:2021 | 05 | 2021 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,965 | $510 | Implemented |
CW0120 # 04 Y:2021 | 04 | 2021 | MODIFY STARTUP/SHUTDOWN TIMES | $2,380 | $100,000 | Implemented |
CW0120 # 03 Y:2021 | 03 | 2021 | USE BATTERY STORAGE FOR DEMAND CONTROL | $18,089 | $25,885 | Implemented |
UD0939 # 08 Y:2016 | 08 | 2016 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,699 | $315 | Implemented |
UD0939 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $1,588 | $1,013 | Implemented |
UD0939 # 06 Y:2016 | 06 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $164 | $375 | Implemented |
UD0939 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,740 | $1,000 | Implemented |
UD0939 # 01 Y:2016 | 01 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,169 | $0 | Implemented |
WV0423 # 04 Y:2011 | 04 | 2011 | REPAIR AND ELIMINATE STEAM LEAKS | $1,472 | $626 | Implemented |
WV0423 # 12 Y:2011 | 12 | 2011 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $272 | $139 | Implemented |
WV0423 # 05 Y:2011 | 05 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $1,173 | $2,443 | Implemented |
WV0423 # 08 Y:2011 | 08 | 2011 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $428 | $183 | Implemented |
WV0423 # 09 Y:2011 | 09 | 2011 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $343 | $177 | Implemented |
WV0423 # 06 Y:2011 | 06 | 2011 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $1,041 | $1,000 | Implemented |
WV0423 # 07 Y:2011 | 07 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $521 | $89 | Implemented |
UD0676 # 05 Y:2003 | 05 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,147 | $2,000 | Implemented |
UD0676 # 04 Y:2003 | 04 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,015 | $25,000 | Implemented |