IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,680

matching recommendations
Reset
SIC 3728 Aircraft Parts And Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0080 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,222 $160 Implemented
MI0080 # 05 Y:2004 05 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $822 $60 Implemented
UU0060 # 01 Y:2004 01 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,202 $13,200 Implemented
UU0060 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,695 $4,800 Not Implemented
UU0060 # 03 Y:2004 03 2004 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $5,059 $4,000 Implemented
UU0060 # 04 Y:2004 04 2004 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,047 $2,600 Not Implemented
UU0060 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $309 $723 Not Implemented
UU0060 # 06 Y:2004 06 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,853 $0 Not Implemented
UU0060 # 07 Y:2004 07 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,897 $200 Implemented
CO0542 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,390 $600 Implemented
CO0542 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,300 $1,860 Implemented
CO0542 # 03 Y:2004 03 2004 USE SOLAR HEAT TO HEAT WATER $970 $3,780 Not Implemented
CO0542 # 04 Y:2004 04 2004 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $530 $250 Implemented
CO0542 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,380 $52,440 Implemented
CO0542 # 06 Y:2004 06 2004 USE PHOTOCELL CONTROLS $4,900 $18,630 Implemented
AS0375 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,472 $11,485 Not Implemented
AS0375 # 02 Y:2004 02 2004 INSTALL OCCUPANCY SENSORS $880 $900 Not Implemented
AS0375 # 03 Y:2004 03 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,797 $26,415 Not Implemented
AS0375 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $468 $737 Implemented
AS0375 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $168 $60 Implemented
AS0375 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,132 $30 Implemented
OK0672 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,885 $6,844 Not Implemented
OK0672 # 02 Y:2003 02 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $28,340 $0 Not Implemented
OK0672 # 03 Y:2003 03 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $12,626 $2,000 Implemented
OK0672 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,333 $145 Not Implemented