IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

257

matching recommendations
Reset
SIC 3732 Boat Building And Repairing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0192 # 05 Y:1998 05 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $36,140 $0 Implemented
ME0227 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,383 $7,504 Implemented
ME0227 # 02 Y:1997 02 1997 USE OPTIMUM THICKNESS INSULATION $790 $960 Implemented
ME0227 # 03 Y:1997 03 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $756 $0 Implemented
ME0227 # 04 Y:1997 04 1997 USE OPTIMUM THICKNESS INSULATION $515 $588 Implemented
ME0227 # 06 Y:1997 06 1997 USE OPTIMUM THICKNESS INSULATION $408 $75 Implemented
ME0227 # 07 Y:1997 07 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $359 $100 Implemented
ME0227 # 08 Y:1997 08 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $217 $185 Implemented
ME0227 # 10 Y:1997 10 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $540 $1,188 Implemented
TN0611 # 01 Y:1997 01 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $201,410 $28,000 Implemented
TN0611 # 02 Y:1997 02 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $34,735 $41,885 Implemented
TN0611 # 04 Y:1997 04 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,330 $3,240 Implemented
TN0611 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $860 $0 Implemented
KU0470 # 01 Y:1996 01 1996 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $181,872 $5,120 Implemented
KU0470 # 02 Y:1996 02 1996 DISTILL CONTAMINATED SOLVENTS FOR REUSE $32,289 $17,350 Implemented
KU0470 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,532 $252 Implemented
KU0470 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $2,397 $2,450 Implemented
KU0470 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $715 $1,958 Implemented
UF0163 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,440 $1,980 Implemented
UF0163 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,019 $1,350 Implemented
UF0163 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,912 $3,214 Implemented
UF0163 # 05 Y:1996 05 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,670 $3,500 Implemented
UF0163 # 08 Y:1996 08 1996 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $8,475 $8,488 Implemented
UF0157 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,698 $3,997 Implemented
UF0157 # 03 Y:1996 03 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,777 $4,300 Implemented