IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

139

matching recommendations
Reset
SIC 376 Guided Missiles, Space Vehicles, Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0319 # 03 Y:2007 03 2007 USE PHOTOCELL CONTROLS $328 $250 Not Implemented
UU0112 # 04 Y:2006 04 2006 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $69,680 $200,000 Not Implemented
UU0112 # 06 Y:2006 06 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,030 $0 Not Implemented
UU0112 # 05 Y:2006 05 2006 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $65,810 $442,960 Not Implemented
UU0112 # 02 Y:2006 02 2006 REPAIR OR REPLACE STEAM TRAPS $121,540 $8,720 Not Implemented
UU0112 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $0 $0 Not Implemented
UU0112 # 03 Y:2006 03 2006 CLOSE OFF UNNEEDED STEAM LINES $140,530 $250,000 Not Implemented
LM0102 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,712 $200 Implemented
LM0102 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,202 $500 Implemented
LM0102 # 04 Y:2005 04 2005 $450,000 $15,000 Not Implemented
LM0102 # 05 Y:2005 05 2005 $1,258,000 $1,250,000 Implemented
LM0102 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,058 $1,000 Implemented
MS0276 # 08 Y:2005 08 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $398 $478 Not Implemented
MS0276 # 02 Y:2005 02 2005 INSTALL OCCUPANCY SENSORS $32,940 $298 Not Implemented
MS0276 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,492 $8,838 Not Implemented
MS0276 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,566 $20,159 Implemented
MS0276 # 01 Y:2005 01 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $64,043 $8,505 Not Implemented
MS0276 # 06 Y:2005 06 2005 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,712 $1,848 Not Implemented
MS0276 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,158 $1,871 Implemented
MS0276 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,547 $15,656 Not Implemented
UU0054 # 07 Y:2003 07 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,752 $0 n/a
UU0054 # 05 Y:2003 05 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,909 $3,500 n/a
UU0054 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $868 $10,415 n/a
UU0054 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $1,487 $720 n/a
UU0054 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $170 $698 n/a