IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
SIC 3769 Space Vehicle Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0319 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,763 $0 Implemented
BD0319 # 01 Y:2007 01 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $21,538 $875 Implemented
LM0102 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,058 $1,000 Implemented
LM0102 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,202 $500 Implemented
LM0102 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,712 $200 Implemented
LM0102 # 05 Y:2005 05 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,258,000 $1,250,000 Implemented
MS0276 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,566 $20,159 Implemented
MS0276 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,158 $1,871 Implemented
TA0016 # 11 Y:2001 11 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $254 $542 Implemented
TA0016 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $13,585 $2,910 Implemented
TA0016 # 06 Y:2001 06 2001 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,920 $54 Implemented
TA0016 # 07 Y:2001 07 2001 USE PHOTOCELL CONTROLS $1,696 $225 Implemented
TA0016 # 01 Y:2001 01 2001 REPLACE BOILER $420,482 $9,456 Implemented
TA0016 # 09 Y:2001 09 2001 INSTALL OCCUPANCY SENSORS $1,032 $320 Implemented
TA0016 # 02 Y:2001 02 2001 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $15,055 $600 Implemented
TA0016 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,090 $1,200 Implemented
SF0194 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,331 $57,900 Implemented
SF0194 # 02 Y:2000 02 2000 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $5,898 $3,720 Implemented
SF0194 # 03 Y:2000 03 2000 COVER OPEN TANKS $550 $746 Implemented
SF0194 # 05 Y:2000 05 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,052 $0 Implemented
AS0144 # 01 Y:1995 01 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $42,045 $63,900 Implemented
AS0144 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,451 $5,634 Implemented
AS0144 # 04 Y:1995 04 1995 USE SYNTHETIC LUBRICANT $1,119 $1,380 Implemented
AS0144 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $704 $0 Implemented
AS0144 # 06 Y:1995 06 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $358 $1,305 Implemented