IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,872

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0389 # 01 Y:2009 01 2009 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,844 $1,000 Implemented
NC0387 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,447 $100 Implemented
NC0387 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,156 $85,555 Implemented
DL0026 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $38,000 $0 Implemented
DL0026 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,500 $0 Implemented
DL0026 # 07 Y:2008 07 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $23,000 $40,000 Implemented
DL0026 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,377 $45,000 Implemented
CO0614 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,580 $1,500 Implemented
CO0614 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $1,670 $1,000 Implemented
CO0614 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,010 $12,000 Implemented
CO0613 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,500 $3,000 Implemented
CO0613 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $6,330 $9,130 Implemented
CO0613 # 07 Y:2008 07 2008 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,390 $1,000 Implemented
GT0850 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,172 $10,000 Implemented
SD0407 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,517 $5,878 Implemented
SD0407 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,196 $13,699 Implemented
SD0407 # 04 Y:2008 04 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,008 $7,140 Implemented
SD0407 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,341 $1,374 Implemented
MA0638 # 03 Y:2008 03 2008 REDUCE VENTILATION AIR $12,360 $2,500 Implemented
MA0638 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,761 $0 Implemented
MA0638 # 08 Y:2008 08 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $1,670 $3,000 Implemented
MA0638 # 10 Y:2008 10 2008 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,230 $2,000 Implemented
NC0373 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $650 $100 Implemented
NC0373 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,639 $5,398 Implemented
NC0373 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,879 $9,158 Implemented