IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,140

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0292 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,922 $2,510 Implemented
ND0292 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $2,468 $338 Implemented
ND0292 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,452 $6,303 Implemented
ND0292 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,679 $80 Implemented
ND0292 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,312 $950 Implemented
ND0292 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $911 $900 Implemented
ND0292 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $301 $208 Implemented
ND0292 # 08 Y:1998 08 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $96 $0 Implemented
ND0292 # 09 Y:1998 09 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $59 $350 Implemented
ND0292 # 10 Y:1998 10 1998 OPTIMIZE PLANT POWER FACTOR $4,292 $9,475 Implemented
KU0485 # 01 Y:1997 01 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,310 $190 Implemented
KU0485 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $560 $660 Implemented
KU0485 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $470 $300 Implemented
KU0485 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $230 $40 Not Implemented
KU0485 # 05 Y:1997 05 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,170 $5,260 Not Implemented
KU0485 # 06 Y:1997 06 1997 RECOVER AND REUSE COOLING WATER $1,080 $1,180 Implemented
KU0485 # 07 Y:1997 07 1997 METER WASTE WATER $230 $100 Implemented
KU0485 # 08 Y:1997 08 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $128,310 $186,000 Not Implemented
UF0186 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,486 $20,719 Not Implemented
UF0186 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $2,264 $1,984 Implemented
UF0186 # 03 Y:1997 03 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $313 $133 Implemented
UF0186 # 04 Y:1997 04 1997 USE OPTIMUM THICKNESS INSULATION $15,189 $35,749 Implemented
UF0186 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $15,704 $9,000 Not Implemented
UF0186 # 06 Y:1997 06 1997 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $2,700 $5,800 Implemented
UF0186 # 07 Y:1997 07 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,376 $35,000 Not Implemented