IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

478

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0419 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,291 $0 Not Implemented
UF0419 # 04 Y:2009 04 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $490 $0 Not Implemented
UF0419 # 05 Y:2009 05 2009 OPTIMIZE PLANT POWER FACTOR $2,671 $3,405 Not Implemented
UF0419 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $32,995 $9,325 Not Implemented
UF0419 # 07 Y:2009 07 2009 INSULATE BARE EQUIPMENT $112,051 $1,026 Not Implemented
UF0419 # 08 Y:2009 08 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $107,292 $42,500 Not Implemented
UF0419 # 09 Y:2009 09 2009 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $41,483 $4,000 Not Implemented
UF0419 # 10 Y:2009 10 2009 SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE $2,671 $3,405 Not Implemented
MI0163 # 01 Y:2008 01 2008 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $600,000 $200,000 Implemented
MI0163 # 02 Y:2008 02 2008 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,234 $48,055 Not Implemented
MI0163 # 03 Y:2008 03 2008 INSULATE BARE EQUIPMENT $4,023 $1,957 Implemented
MI0163 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,724 $11,286 Implemented
MI0163 # 05 Y:2008 05 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,968 $2,151 Implemented
UF0399 # 01 Y:2007 01 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,373 $24,800 Not Implemented
UF0399 # 02 Y:2007 02 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $349 $1,376 Not Implemented
UF0399 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,878 $437 Implemented
UF0399 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,852 $0 Implemented
UF0399 # 05 Y:2007 05 2007 USE OPTIMUM THICKNESS INSULATION $1,157 $188 Not Implemented
UF0399 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $939 $0 Not Implemented
UF0399 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,311 $44,692 Not Implemented
UF0399 # 08 Y:2007 08 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $47,277 $35,000 Not Implemented
UF0399 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,017 $1,719 Not Implemented
UF0399 # 10 Y:2007 10 2007 INSTALL OCCUPANCY SENSORS $1,761 $404 Implemented
UF0399 # 11 Y:2007 11 2007 RECYCLE FLUORESCENT LAMPS $1,005 $3,486 Implemented
UF0399 # 12 Y:2007 12 2007 CHANGE OPERATING CONDITIONS $74,852 $731 Implemented