IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

478

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0307 # 07 Y:2002 07 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $39,511 $50 Not Implemented
UF0307 # 08 Y:2002 08 2002 RECYCLE FLUORESCENT LAMPS $1,147 $1,895 Not Implemented
UF0307 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $37,098 $15,000 Not Implemented
UF0287 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,092 $920 Implemented
UF0287 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $1,260 $2,081 Not Implemented
UF0287 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,637 $16,038 Not Implemented
UF0287 # 04 Y:2001 04 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,729 $10,788 Not Implemented
UF0287 # 05 Y:2001 05 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $28,709 $20,000 Implemented
UF0287 # 06 Y:2001 06 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,358 $0 Implemented
UF0287 # 07 Y:2001 07 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,303 $225 Not Implemented
UF0287 # 08 Y:2001 08 2001 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $39,000 $5,247 Implemented
UF0287 # 09 Y:2001 09 2001 PAY UTILITY BILLS ON TIME $15,147 $0 Not Implemented
UF0287 # 10 Y:2001 10 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $29,250 $3,000 Implemented
MI0024 # 01 Y:2001 01 2001 ISOLATE HOT OR COLD EQUIPMENT $156,000 $10,000 n/a
MI0024 # 02 Y:2001 02 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,590 $7 n/a
MI0024 # 03 Y:2001 03 2001 ADD AREA LIGHTING SWITCHES $2,108 $1,000 n/a
MI0024 # 04 Y:2001 04 2001 ADD AREA LIGHTING SWITCHES $1,333 $700 n/a
MI0024 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $200 $2 n/a
MI0002 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,063 $414 Not Implemented
MI0002 # 02 Y:2001 02 2001 UPGRADE OBSOLETE EQUIPMENT $22,409 $6,500 Not Implemented
MI0002 # 03 Y:2001 03 2001 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $30,943 $20 Not Implemented
MI0002 # 04 Y:2001 04 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $47,000 $300 Not Implemented
MI0002 # 05 Y:2001 05 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,034 $3,531 Not Implemented
MI0002 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,800 $35 Not Implemented
MI0002 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,119 $690 Not Implemented