Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
120
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0224 # 01 Y:2001 | 01 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,086 | $7,500 | Implemented |
NC0224 # 02 Y:2001 | 02 | 2001 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $16,136 | $45,000 | Not Implemented |
NC0224 # 03 Y:2001 | 03 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,746 | $5,000 | Not Implemented |
NC0224 # 04 Y:2001 | 04 | 2001 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $19,065 | $40,000 | Implemented |
NC0224 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,339 | $1,690 | Implemented |
NC0224 # 06 Y:2001 | 06 | 2001 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $113 | $300 | Implemented |
NC0194 # 01 Y:2000 | 01 | 2000 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $429 | $835 | Implemented |
NC0194 # 02 Y:2000 | 02 | 2000 | INSTALL SKYLIGHTS | $3,443 | $7,000 | Implemented |
NC0194 # 03 Y:2000 | 03 | 2000 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $13,561 | $29,000 | Implemented |
NC0194 # 04 Y:2000 | 04 | 2000 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $483 | $400 | Not Implemented |
NC0194 # 05 Y:2000 | 05 | 2000 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $29,846 | $20,200 | Implemented |
NC0151 # 01 Y:1998 | 01 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,157 | $600 | Not Implemented |
NC0151 # 02 Y:1998 | 02 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $33,411 | $132,700 | Not Implemented |
NC0151 # 03 Y:1998 | 03 | 1998 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $401 | $1,500 | Not Implemented |
NC0151 # 04 Y:1998 | 04 | 1998 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $700 | $2,100 | Not Implemented |
NC0151 # 05 Y:1998 | 05 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,290 | $3,000 | Not Implemented |
NC0151 # 06 Y:1998 | 06 | 1998 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $3,822 | $15,000 | Not Implemented |
NC0151 # 07 Y:1998 | 07 | 1998 | USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS | $11,500 | $45,000 | Not Implemented |
NC0151 # 08 Y:1998 | 08 | 1998 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,721 | $16,000 | Not Implemented |
NC0142 # 01 Y:1998 | 01 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $2,463 | $1,050 | Implemented |
NC0142 # 02 Y:1998 | 02 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,239 | $0 | Implemented |
NC0142 # 03 Y:1998 | 03 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,688 | $1,200 | Implemented |
NC0142 # 04 Y:1998 | 04 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,769 | $9,000 | Not Implemented |
NC0142 # 05 Y:1998 | 05 | 1998 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,977 | $1,448 | Not Implemented |
NC0142 # 06 Y:1998 | 06 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,279 | $31,754 | Implemented |