IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,140

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0562 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,279 $600 Implemented
UU0128 # 01 Y:2018 01 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $109,419 $1,693 Implemented
UU0128 # 02 Y:2018 02 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $80,946 $500 Implemented
UU0128 # 03 Y:2018 03 2018 ADD AREA LIGHTING SWITCHES $1,227 $2,200 Implemented
UU0128 # 04 Y:2018 04 2018 DISCONNECT BALLASTS $958 $800 Not Implemented
UU0128 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $829 $0 Implemented
MI0324 # 01 Y:2017 01 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $94,097 $134,000 Not Implemented
MI0324 # 02 Y:2017 02 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $28,637 $15,056 Implemented
MI0324 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $28,032 $41,300 Implemented
MI0324 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,387 $8,923 Implemented
MI0324 # 05 Y:2017 05 2017 COMBINE UTILITY METERS $7,245 $100 Not Implemented
MI0324 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,467 $4,900 Implemented
MI0324 # 07 Y:2017 07 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,663 $1,478 Implemented
MI0324 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $3,528 $1,000 Implemented
MI0324 # 09 Y:2017 09 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,760 $250 Not Implemented
MI0324 # 10 Y:2017 10 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,051 $1,722 Implemented
MI0324 # 11 Y:2017 11 2017 USE DEMAND CONTROLLER OR LOAD SHEDDER $670 $100 Not Implemented
SD0554 # 01 Y:2017 01 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $30,343 $65,600 Implemented
SD0554 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,849 $4,785 Not Implemented
SD0554 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,421 $15,275 Implemented
SD0554 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,214 $2,470 Not Implemented
SD0554 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $356 $1,450 Implemented
SD0554 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $274 $1,300 Implemented
SD0554 # 07 Y:2017 07 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $271 $200 Implemented
NL0008 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,345 $0 Implemented