IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

214

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0661 # 06 Y:2010 06 2010 AIR CONDITION ONLY SPACE NECESSARY $2,526 $11,040 Implemented
MA0660 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,403 $9,546 Implemented
MA0660 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,241 $0 Not Implemented
MA0660 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $58,587 $0 Implemented
MA0660 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,601 $19,240 Not Implemented
MA0660 # 05 Y:2010 05 2010 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $23,123 $0 Implemented
MA0638 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $43,903 $225,000 Not Implemented
MA0638 # 02 Y:2008 02 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $23,075 $56,000 Not Implemented
MA0638 # 03 Y:2008 03 2008 REDUCE VENTILATION AIR $12,360 $2,500 Implemented
MA0638 # 04 Y:2008 04 2008 IMPROVE COMBUSTION CONTROL CAPABILITY $6,135 $20,000 Not Implemented
MA0638 # 05 Y:2008 05 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,325 $8,800 Not Implemented
MA0638 # 06 Y:2008 06 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,428 $16,500 Not Implemented
MA0638 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,761 $0 Implemented
MA0638 # 08 Y:2008 08 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $1,670 $3,000 Implemented
MA0638 # 09 Y:2008 09 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,488 $2,450 Not Implemented
MA0638 # 10 Y:2008 10 2008 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,230 $2,000 Implemented
MA0589 # 01 Y:2006 01 2006 BURN A LESS EXPENSIVE GRADE OF FUEL $29,215 $95,420 Not Implemented
MA0589 # 02 Y:2006 02 2006 USE MINIMUM SAFE OVEN VENTILATION $13,600 $1,600 Not Implemented
MA0589 # 03 Y:2006 03 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,300 $4,000 Implemented
MA0589 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,608 $10,890 Not Implemented
MA0589 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,311 $3,565 Implemented
MA0589 # 06 Y:2006 06 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,951 $400 Implemented
MA0589 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $2,060 $1,800 Implemented
MA0589 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $187 $60 Implemented
MA0589 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $177 $800 Implemented