Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
214
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0661 # 06 Y:2010 | 06 | 2010 | AIR CONDITION ONLY SPACE NECESSARY | $2,526 | $11,040 | Implemented |
MA0660 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,403 | $9,546 | Implemented |
MA0660 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,241 | $0 | Not Implemented |
MA0660 # 03 Y:2010 | 03 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $58,587 | $0 | Implemented |
MA0660 # 04 Y:2010 | 04 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,601 | $19,240 | Not Implemented |
MA0660 # 05 Y:2010 | 05 | 2010 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $23,123 | $0 | Implemented |
MA0638 # 01 Y:2008 | 01 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $43,903 | $225,000 | Not Implemented |
MA0638 # 02 Y:2008 | 02 | 2008 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $23,075 | $56,000 | Not Implemented |
MA0638 # 03 Y:2008 | 03 | 2008 | REDUCE VENTILATION AIR | $12,360 | $2,500 | Implemented |
MA0638 # 04 Y:2008 | 04 | 2008 | IMPROVE COMBUSTION CONTROL CAPABILITY | $6,135 | $20,000 | Not Implemented |
MA0638 # 05 Y:2008 | 05 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,325 | $8,800 | Not Implemented |
MA0638 # 06 Y:2008 | 06 | 2008 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,428 | $16,500 | Not Implemented |
MA0638 # 07 Y:2008 | 07 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,761 | $0 | Implemented |
MA0638 # 08 Y:2008 | 08 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,670 | $3,000 | Implemented |
MA0638 # 09 Y:2008 | 09 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,488 | $2,450 | Not Implemented |
MA0638 # 10 Y:2008 | 10 | 2008 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $1,230 | $2,000 | Implemented |
MA0589 # 01 Y:2006 | 01 | 2006 | BURN A LESS EXPENSIVE GRADE OF FUEL | $29,215 | $95,420 | Not Implemented |
MA0589 # 02 Y:2006 | 02 | 2006 | USE MINIMUM SAFE OVEN VENTILATION | $13,600 | $1,600 | Not Implemented |
MA0589 # 03 Y:2006 | 03 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,300 | $4,000 | Implemented |
MA0589 # 04 Y:2006 | 04 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,608 | $10,890 | Not Implemented |
MA0589 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,311 | $3,565 | Implemented |
MA0589 # 06 Y:2006 | 06 | 2006 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,951 | $400 | Implemented |
MA0589 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $2,060 | $1,800 | Implemented |
MA0589 # 08 Y:2006 | 08 | 2006 | INSULATE BARE EQUIPMENT | $187 | $60 | Implemented |
MA0589 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $177 | $800 | Implemented |