Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,140
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0638 # 01 Y:2008 | 01 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $43,903 | $225,000 | Not Implemented |
MA0638 # 02 Y:2008 | 02 | 2008 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $23,075 | $56,000 | Not Implemented |
MA0638 # 03 Y:2008 | 03 | 2008 | REDUCE VENTILATION AIR | $12,360 | $2,500 | Implemented |
MA0638 # 04 Y:2008 | 04 | 2008 | IMPROVE COMBUSTION CONTROL CAPABILITY | $6,135 | $20,000 | Not Implemented |
MA0638 # 05 Y:2008 | 05 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,325 | $8,800 | Not Implemented |
MA0638 # 06 Y:2008 | 06 | 2008 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,428 | $16,500 | Not Implemented |
MA0638 # 07 Y:2008 | 07 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,761 | $0 | Implemented |
MA0638 # 08 Y:2008 | 08 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,670 | $3,000 | Implemented |
MA0638 # 09 Y:2008 | 09 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,488 | $2,450 | Not Implemented |
MA0638 # 10 Y:2008 | 10 | 2008 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $1,230 | $2,000 | Implemented |
NC0373 # 01 Y:2008 | 01 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,343 | $15,000 | Not Implemented |
NC0373 # 02 Y:2008 | 02 | 2008 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $13,018 | $26,250 | Not Implemented |
NC0373 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $650 | $100 | Implemented |
NC0373 # 04 Y:2008 | 04 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,993 | $16,000 | Not Implemented |
NC0373 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,639 | $5,398 | Implemented |
NC0373 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,879 | $9,158 | Implemented |
MI0163 # 01 Y:2008 | 01 | 2008 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $600,000 | $200,000 | Implemented |
MI0163 # 02 Y:2008 | 02 | 2008 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,234 | $48,055 | Not Implemented |
MI0163 # 03 Y:2008 | 03 | 2008 | INSULATE BARE EQUIPMENT | $4,023 | $1,957 | Implemented |
MI0163 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,724 | $11,286 | Implemented |
MI0163 # 05 Y:2008 | 05 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,968 | $2,151 | Implemented |
CO0610 # 01 Y:2008 | 01 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,340 | $13,163 | Implemented |
CO0610 # 02 Y:2008 | 02 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,470 | $1,400 | Implemented |
CO0610 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $880 | $500 | Implemented |
CO0610 # 04 Y:2008 | 04 | 2008 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,690 | $15,668 | Implemented |