IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,140

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0654 # 03 Y:2003 03 2003 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,131 $0 Not Implemented
OK0654 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $487 $640 Not Implemented
OK0654 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $336 $349 Not Implemented
OK0654 # 06 Y:2003 06 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $232,400 $2,844 Not Implemented
OK0654 # 07 Y:2003 07 2003 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $1,040 $165 Not Implemented
SD0311 # 01 Y:2003 01 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,146 $19,000 Not Implemented
SD0311 # 02 Y:2003 02 2003 USE PHOTOCELL CONTROLS $3,064 $2,000 Implemented
SD0311 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $501 $0 Implemented
SD0311 # 04 Y:2003 04 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,622 $5,000 Implemented
SD0311 # 05 Y:2003 05 2003 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $31,104 $0 Not Implemented
UU0035 # 01 Y:2002 01 2002 REPAIR OR REPLACE STEAM TRAPS $2,311 $2,560 Not Implemented
UU0035 # 02 Y:2002 02 2002 DIRECT WARMEST AIR TO COMBUSTION INTAKE $678 $900 Not Implemented
UU0035 # 03 Y:2002 03 2002 INCREASE AMOUNT OF CONDENSATE RETURNED $4,551 $1,225 Not Implemented
UU0035 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,260 $850 Not Implemented
UU0035 # 05 Y:2002 05 2002 RECOVER AND REUSE COOLING WATER $1,491 $1,000 Not Implemented
CO0517 # 01 Y:2002 01 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $26,170 $55,600 n/a
CO0517 # 02 Y:2002 02 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,900 $5,000 Not Implemented
CO0517 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,640 $800 Implemented
CO0517 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,290 $2,740 Implemented
AS0335 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $400 $1,425 Not Implemented
AS0335 # 02 Y:2002 02 2002 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $501 $200 Not Implemented
AS0335 # 03 Y:2002 03 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,394 $32,550 Not Implemented
AS0335 # 04 Y:2002 04 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,813 $0 Not Implemented
AS0335 # 05 Y:2002 05 2002 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,738 $15,320 Not Implemented
AS0333 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $597 $20 Implemented