Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0641 # 09 Y:2010 | 09 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $320 | $650 | Not Implemented |
CO0641 # 08 Y:2010 | 08 | 2010 | INSTALL OCCUPANCY SENSORS | $520 | $810 | Not Implemented |
CO0641 # 07 Y:2010 | 07 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,300 | $5,160 | Not Implemented |
CO0641 # 06 Y:2010 | 06 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,270 | $35,500 | Not Implemented |
CO0641 # 05 Y:2010 | 05 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,610 | $2,880 | Not Implemented |
CO0641 # 04 Y:2010 | 04 | 2010 | USE SOLAR HEAT TO MAKE ELECTRICTY | $4,170 | $31,500 | Not Implemented |
CO0641 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,910 | $5,160 | Not Implemented |
CO0641 # 02 Y:2010 | 02 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,220 | $3,400 | Not Implemented |
CO0641 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,720 | $410 | Not Implemented |
CO0517 # 01 Y:2002 | 01 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $26,170 | $55,600 | n/a |
CO0517 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,290 | $2,740 | Implemented |
CO0517 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,640 | $800 | Implemented |
CO0517 # 02 Y:2002 | 02 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,900 | $5,000 | Not Implemented |
CO0488 # 07 Y:2001 | 07 | 2001 | USE CYLINDRICAL TANKS WITH HEIGHT TO DIAMETER RATIOS CLOSE TO ONE TO REDUCE WETTED SURFACE | $3,610 | $180 | Implemented |
CO0488 # 06 Y:2001 | 06 | 2001 | REPLACE HEAVY METAL REAGENTS WITH NON-HAZARDOUS REAGENTS | $21,060 | $14,000 | Not Implemented |
CO0488 # 05 Y:2001 | 05 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $900 | $0 | Implemented |
CO0488 # 04 Y:2001 | 04 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,650 | $0 | Implemented |
CO0488 # 03 Y:2001 | 03 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,660 | $2,200 | Not Implemented |
CO0488 # 02 Y:2001 | 02 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,300 | $6,000 | Not Implemented |
CO0488 # 01 Y:2001 | 01 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,910 | $3,000 | Implemented |
CO0453 # 01 Y:1999 | 01 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,250 | $1,380 | Not Implemented |
CO0453 # 06 Y:1999 | 06 | 1999 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $320 | $890 | Not Implemented |
CO0453 # 05 Y:1999 | 05 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $670 | $320 | Not Implemented |
CO0453 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $800 | $240 | Not Implemented |
CO0453 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,380 | $2,150 | Not Implemented |