Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0746 # 03 Y:2022 | 03 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $38,605 | $550,846 | Not Implemented |
OR0746 # 02 Y:2022 | 02 | 2022 | ELIMINATE/REDUCE AN OPERATION | $2,177 | $49 | Implemented |
OR0746 # 01 Y:2022 | 01 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,050 | $2,975 | Not Implemented |
OR0651 # 03 Y:2015 | 03 | 2015 | RECOVER AND REUSE WASTE MATERIAL | $93,635 | $132,280 | Not Implemented |
OR0651 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $270,822 | $210,050 | Implemented |
OR0651 # 01 Y:2015 | 01 | 2015 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $58,422 | $9,638 | Implemented |
OR0650 # 01 Y:2015 | 01 | 2015 | ELIMINATE/REDUCE AN OPERATION | $20,348 | $2,295 | Not Implemented |
OR0650 # 06 Y:2015 | 06 | 2015 | USE SOLAR HEAT TO MAKE ELECTRICTY | $16,731 | $135,510 | Not Implemented |
OR0650 # 05 Y:2015 | 05 | 2015 | HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE | $1,291 | $4,404 | Implemented |
OR0650 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $1,001 | $2,678 | Not Implemented |
OR0650 # 03 Y:2015 | 03 | 2015 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $719 | $1,200 | Implemented |
OR0650 # 02 Y:2015 | 02 | 2015 | IMPROVE COMBUSTION CONTROL CAPABILITY | $23,922 | $24,660 | Not Implemented |
OR0461 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $1,910 | $875 | Not Implemented |
OR0461 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,290 | $2,690 | Implemented |
OR0461 # 02 Y:2004 | 02 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $303,000 | $1,000 | Not Implemented |
OR0461 # 01 Y:2004 | 01 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,372,930 | $1,150 | Implemented |
OR0140 # 04 Y:1992 | 04 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $905 | $3,600 | Implemented |
OR0140 # 03 Y:1992 | 03 | 1992 | KEEP LAMPS AND REFLECTORS CLEAN | $5,409 | $0 | Implemented |
OR0140 # 02 Y:1992 | 02 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,543 | $0 | Implemented |
OR0140 # 01 Y:1992 | 01 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $357 | $0 | Implemented |
OR0020 # 01 Y:1988 | 01 | 1988 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,310 | $0 | Not Implemented |
OR0020 # 03 Y:1988 | 03 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $415 | $100 | Not Implemented |
OR0020 # 02 Y:1988 | 02 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,539 | $0 | Implemented |