IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

94

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0309 # 05 Y:2024 05 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,687 $0 Not Implemented
TT0309 # 10 Y:2024 10 2024 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $2,373 $430 Not Implemented
TT0309 # 04 Y:2024 04 2024 REPLACE BOILER $18,200 $104,000 Not Implemented
TT0309 # 01 Y:2024 01 2024 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $83,523 $250,000 Not Implemented
TT0309 # 07 Y:2024 07 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,333 $0 Not Implemented
TT0309 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,407 $4,800 Not Implemented
TT0309 # 08 Y:2024 08 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,336 $20,480 Not Implemented
TT0309 # 09 Y:2024 09 2024 METER WASTE WATER $4,799 $1,100 Not Implemented
TT0309 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,028 $1,500 Not Implemented
TT0309 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,893 $157,700 Not Implemented
TT0305 # 01 Y:2024 01 2024 ADOPT IN-HOUSE MATERIAL GENERATION $50,976 $15,000 Not Implemented
TT0305 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN WATER LINES AND VALVES $12,922 $5,000 Implemented
TT0305 # 04 Y:2024 04 2024 AIR CONDITION ONLY SPACE NECESSARY $6,707 $1,060 Implemented
TT0305 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $637 $125 Implemented
TT0305 # 02 Y:2024 02 2024 ADOPT IN-HOUSE MATERIAL GENERATION $34,931 $146,400 Not Implemented
TT0305 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $212 $60 Implemented
TT0305 # 08 Y:2024 08 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $82 $174 Not Implemented
TT0305 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,366 $3,000 Not Implemented
TT0221 # 02 Y:2019 02 2019 INSTALL TIMERS AND/OR THERMOSTATS $4,069 $2,280 Not Implemented
TT0221 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,435 $30 Not Implemented
TT0221 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $33 $80 Not Implemented
TT0221 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,132 $36,211 Implemented
TT0221 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $1,958 $7,400 Not Implemented
TT0208 # 02 Y:2018 02 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,000 $2,500 Not Implemented
TT0208 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,732 $2,250 Not Implemented