IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0385 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,047 $1,660 Implemented
MI0385 # 07 Y:2020 07 2020 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,275 $234 Implemented
MI0385 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,589 $6,672 Implemented
MI0385 # 05 Y:2020 05 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,338 $100 Not Implemented
MI0385 # 08 Y:2020 08 2020 INSULATE BARE EQUIPMENT $754 $1,614 Not Implemented
MI0385 # 06 Y:2020 06 2020 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,866 $4,760 Implemented
MI0385 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,898 $2,100 Implemented
MI0385 # 04 Y:2020 04 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,719 $3,215 Not Implemented
MI0379 # 02 Y:2020 02 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,551 $2,080 Not Implemented
MI0379 # 01 Y:2020 01 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $192,230 $217,000 Implemented
MI0379 # 05 Y:2020 05 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,953 $5,914 Not Implemented
MI0379 # 03 Y:2020 03 2020 USE SOLAR HEAT TO HEAT WATER $9,075 $12,000 Not Implemented
MI0379 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,846 $1,980 Not Implemented
MI0379 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,317 $2,100 Not Implemented
CO0739 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $291 $185 Implemented
CO0739 # 01 Y:2020 01 2020 INSTALL OCCUPANCY SENSORS $5,400 $11,069 Not Implemented
CO0739 # 06 Y:2020 06 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,090 $0 Implemented
CO0739 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $1,541 $3,605 Not Implemented
CO0739 # 04 Y:2020 04 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,067 $0 Implemented
CO0739 # 02 Y:2020 02 2020 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,357 $12,500 Not Implemented
MZ0288 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,689 $41,089 Not Implemented
MZ0288 # 05 Y:2020 05 2020 RECOVER WASTE HEAT FROM EQUIPMENT $424 $430 Not Implemented
MZ0288 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,574 $1,660 Not Implemented
MZ0288 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,502 $3,320 Not Implemented
MZ0288 # 02 Y:2020 02 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,118 $3,400 Not Implemented