Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0305 # 02 Y:2024 | 02 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $34,931 | $146,400 | Not Implemented |
TT0305 # 04 Y:2024 | 04 | 2024 | AIR CONDITION ONLY SPACE NECESSARY | $6,707 | $1,060 | Implemented |
TT0305 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,366 | $3,000 | Not Implemented |
TT0305 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $637 | $125 | Implemented |
TT0305 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $12,922 | $5,000 | Implemented |
TT0305 # 01 Y:2024 | 01 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $50,976 | $15,000 | Not Implemented |
TT0305 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $212 | $60 | Implemented |
TT0305 # 08 Y:2024 | 08 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $82 | $174 | Not Implemented |
TT0221 # 05 Y:2019 | 05 | 2019 | INSULATE BARE EQUIPMENT | $33 | $80 | Not Implemented |
TT0221 # 02 Y:2019 | 02 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $4,069 | $2,280 | Not Implemented |
TT0221 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,132 | $36,211 | Implemented |
TT0221 # 03 Y:2019 | 03 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,958 | $7,400 | Not Implemented |
TT0221 # 04 Y:2019 | 04 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,435 | $30 | Not Implemented |
TT0207 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,878 | $41,788 | Implemented |
TT0207 # 02 Y:2018 | 02 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,922 | $9,020 | Not Implemented |
TT0207 # 03 Y:2018 | 03 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,589 | $2,450 | Implemented |
TT0207 # 04 Y:2018 | 04 | 2018 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $1,313 | $250 | Not Implemented |
TT0207 # 05 Y:2018 | 05 | 2018 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $618 | $1,770 | Not Implemented |
TN0588 # 01 Y:1996 | 01 | 1996 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $45,192 | $51,320 | Implemented |
TN0588 # 02 Y:1996 | 02 | 1996 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $14,500 | $13,000 | Not Implemented |
TN0588 # 03 Y:1996 | 03 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,760 | $5,300 | Implemented |
TN0588 # 04 Y:1996 | 04 | 1996 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $610 | $1,800 | Not Implemented |
TN0588 # 05 Y:1996 | 05 | 1996 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $545 | $0 | Not Implemented |
TN0588 # 06 Y:1996 | 06 | 1996 | INSTALL OCCUPANCY SENSORS | $290 | $845 | Implemented |
TN0243 # 03 Y:1985 | 03 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $906 | $30 | Implemented |