Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,723
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0442 # 09 Y:2017 | 09 | 2017 | UPGRADE OBSOLETE EQUIPMENT | $108 | $356 | Implemented |
SD0549 # 01 Y:2017 | 01 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $49,288 | $204,000 | Implemented |
SD0549 # 02 Y:2017 | 02 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $16,056 | $3,882 | Implemented |
SD0549 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,048 | $4,352 | Implemented |
SD0549 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $638 | $600 | Implemented |
SD0549 # 05 Y:2017 | 05 | 2017 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $360 | $300 | Implemented |
MA0770 # 01 Y:2017 | 01 | 2017 | REDUCE VENTILATION AIR | $8,661 | $1,503 | Not Implemented |
MA0770 # 02 Y:2017 | 02 | 2017 | AIR CONDITION ONLY SPACE NECESSARY | $2,351 | $1,000 | Not Implemented |
MA0770 # 03 Y:2017 | 03 | 2017 | OPTIMIZE PLANT POWER FACTOR | $1,809 | $2,784 | Implemented |
MA0770 # 04 Y:2017 | 04 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $286 | $20 | Not Implemented |
MA0770 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $124 | $100 | Implemented |
MZ0217 # 01 Y:2016 | 01 | 2016 | CONDENSE OPERATION INTO ONE BUILDING | $4,197 | $900 | Implemented |
MZ0217 # 02 Y:2016 | 02 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $27,674 | $30,000 | Not Implemented |
MZ0217 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,739 | $80,500 | Implemented |
MZ0217 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $6,607 | $3,000 | Implemented |
MZ0217 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $841 | $1,100 | Implemented |
MZ0217 # 06 Y:2016 | 06 | 2016 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $7,627 | $20,000 | Not Implemented |
MZ0217 # 07 Y:2016 | 07 | 2016 | INSULATE BARE EQUIPMENT | $668 | $600 | Not Implemented |
MZ0218 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,078 | $12,500 | Not Implemented |
MZ0218 # 02 Y:2016 | 02 | 2016 | USE PHOTOCELL CONTROLS | $2,869 | $490 | Implemented |
MZ0218 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,572 | $10,350 | Implemented |
MZ0218 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $2,293 | $900 | Implemented |
MZ0218 # 05 Y:2016 | 05 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,810 | $0 | Not Implemented |
MZ0218 # 06 Y:2016 | 06 | 2016 | INSTALL OCCUPANCY SENSORS | $1,603 | $900 | Implemented |
NC0573 # 01 Y:2016 | 01 | 2016 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $2,610 | $100 | Not Implemented |