IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,723

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0796 # 06 Y:2009 06 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,734 $500 Implemented
UD0796 # 07 Y:2009 07 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,104 $10,500 Not Implemented
UD0796 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $935 $2,115 Implemented
UD0796 # 09 Y:2009 09 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $788 $0 Implemented
UD0796 # 10 Y:2009 10 2009 INSTALL AUTOMATIC STACK DAMPER $418 $400 Implemented
UD0796 # 11 Y:2009 11 2009 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $364 $250 Not Implemented
UD0796 # 12 Y:2009 12 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $284 $0 Implemented
UD0796 # 13 Y:2009 13 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $149 $0 Implemented
WV0389 # 01 Y:2009 01 2009 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,844 $1,000 Implemented
WV0389 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,876 $5,376 Not Implemented
WV0389 # 03 Y:2009 03 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,832 $4,053 Not Implemented
WV0389 # 04 Y:2009 04 2009 DEVELOP A REPAIR/REPLACE POLICY $4,703 $662 Implemented
WV0389 # 05 Y:2009 05 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $4,461 $1,740 Not Implemented
WV0389 # 06 Y:2009 06 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,065 $8,080 Not Implemented
WV0389 # 07 Y:2009 07 2009 USE OPTIMUM THICKNESS INSULATION $2,517 $960 Implemented
WV0389 # 08 Y:2009 08 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,947 $290 Not Implemented
WV0389 # 09 Y:2009 09 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,740 $600 Implemented
WV0389 # 10 Y:2009 10 2009 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,613 $6,810 Not Implemented
WV0389 # 11 Y:2009 11 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,462 $2,860 Implemented
WV0389 # 12 Y:2009 12 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,327 $0 Implemented
WV0389 # 13 Y:2009 13 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $962 $0 Not Implemented
WV0389 # 14 Y:2009 14 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $526 $0 Not Implemented
NC0387 # 01 Y:2009 01 2009 USE DEMAND CONTROLLER OR LOAD SHEDDER $202,240 $400,000 Not Implemented
NC0387 # 02 Y:2009 02 2009 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $51,343 $72,000 Not Implemented
NC0387 # 03 Y:2009 03 2009 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $44,613 $45,000 Not Implemented