IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,723

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0554 # 01 Y:2000 01 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,875 $13,000 Not Implemented
KU0554 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,829 $0 Implemented
KU0554 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,480 $1,810 Not Implemented
KU0554 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,445 $0 Implemented
KU0554 # 05 Y:2000 05 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $620 $2,000 Not Implemented
UF0259 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,865 $2,831 Implemented
UF0259 # 02 Y:2000 02 2000 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $5,242 $12,014 Not Implemented
UF0259 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,732 $7,400 Implemented
UF0259 # 04 Y:2000 04 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,323 $50 Implemented
UF0259 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,597 $460 Implemented
UF0259 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,740 $0 Implemented
UF0259 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $835 $1,500 Not Implemented
UF0259 # 08 Y:2000 08 2000 INSTALL OCCUPANCY SENSORS $481 $834 Implemented
UF0259 # 09 Y:2000 09 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $704 $600 Implemented
UF0259 # 10 Y:2000 10 2000 METER WASTE WATER $2,940 $1,500 Implemented
UF0259 # 11 Y:2000 11 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,874 $3,721 Not Implemented
UF0259 # 12 Y:2000 12 2000 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $67,200 $84,000 Not Implemented
NV0167 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,639 $200 Implemented
NV0167 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $414 $50 Implemented
NV0167 # 03 Y:2000 03 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $229 $0 Not Implemented
NV0167 # 04 Y:2000 04 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $3,315 $680 Not Implemented
KU0548 # 01 Y:2000 01 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $13,917 $0 n/a
KU0548 # 02 Y:2000 02 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,154 $11,500 n/a
KU0548 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $3,963 $1,505 n/a
KU0548 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,604 $40 n/a