Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0224 # 04 Y:2001 | 04 | 2001 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $19,065 | $40,000 | Implemented |
NC0224 # 03 Y:2001 | 03 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,746 | $5,000 | Not Implemented |
NC0224 # 02 Y:2001 | 02 | 2001 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $16,136 | $45,000 | Not Implemented |
NC0224 # 01 Y:2001 | 01 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,086 | $7,500 | Implemented |
NC0224 # 06 Y:2001 | 06 | 2001 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $113 | $300 | Implemented |
NC0224 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,339 | $1,690 | Implemented |
WI0403 # 07 Y:2001 | 07 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $685 | $3,600 | Not Implemented |
WI0403 # 06 Y:2001 | 06 | 2001 | INSTALL OCCUPANCY SENSORS | $118 | $450 | Not Implemented |
WI0403 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $188 | $630 | Implemented |
WI0403 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,569 | $16,804 | Not Implemented |
WI0403 # 03 Y:2001 | 03 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,035 | $9,500 | Not Implemented |
WI0403 # 02 Y:2001 | 02 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $20,523 | $0 | Implemented |
WI0403 # 01 Y:2001 | 01 | 2001 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $82,500 | $120,000 | Not Implemented |
UU0007 # 04 Y:2001 | 04 | 2001 | USE SYNTHETIC LUBRICANT | $564 | $400 | Not Implemented |
UU0007 # 05 Y:2001 | 05 | 2001 | RECOVER AND REUSE COOLING WATER | $953 | $20 | Not Implemented |
UU0007 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $3,545 | $7,155 | n/a |
UU0007 # 03 Y:2001 | 03 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $430 | $430 | Implemented |
UU0007 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,319 | $5,852 | n/a |
LM0009 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $35,795 | $195 | n/a |
LM0009 # 06 Y:2001 | 06 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $90,000 | $45,696 | n/a |
LM0009 # 05 Y:2001 | 05 | 2001 | INSTALL SENSORS TO DETECT DEFECTS | $1,277,400 | $300,000 | n/a |
LM0009 # 04 Y:2001 | 04 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $95,096 | $450 | n/a |
LM0009 # 03 Y:2001 | 03 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,805 | $12,000 | n/a |
LM0009 # 02 Y:2001 | 02 | 2001 | INSTALL SKYLIGHTS | $36,728 | $66,000 | n/a |
CO0481 # 07 Y:2001 | 07 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $480 | $30 | Not Implemented |