IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
SIC 3822 Environmental Controls
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0306 # 07 Y:2024 07 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,874 $10,418 n/a
IC0306 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $432 n/a
IC0306 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,340 $0 n/a
IC0306 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $41,459 $20,803 n/a
IC0306 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,638 $33,160 n/a
IC0306 # 03 Y:2024 03 2024 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $2,629 $118 n/a
IC0306 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $22,099 $10,776 n/a
IC0306 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $274,832 $1,429,458 n/a
NC0387 # 05 Y:2009 05 2009 RECOVER WASTE HEAT FROM EQUIPMENT $8,105 $7,000 Not Implemented
NC0387 # 04 Y:2009 04 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $21,000 $25,000 Not Implemented
NC0387 # 03 Y:2009 03 2009 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $44,613 $45,000 Not Implemented
NC0387 # 02 Y:2009 02 2009 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $51,343 $72,000 Not Implemented
NC0387 # 01 Y:2009 01 2009 USE DEMAND CONTROLLER OR LOAD SHEDDER $202,240 $400,000 Not Implemented
NC0387 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,447 $100 Implemented
NC0387 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $712 $351 Not Implemented
NC0387 # 07 Y:2009 07 2009 DEVELOP A REPAIR/REPLACE POLICY $2,019 $2,198 Not Implemented
NC0387 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,156 $85,555 Implemented
UD0713 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,868 $22,600 Not Implemented
UD0713 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,435 $41,783 Implemented
UD0713 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $84,867 $94,373 Not Implemented
UD0713 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,925 $200 Implemented
UD0713 # 02 Y:2005 02 2005 USE OPTIMUM TEMPERATURE $64,754 $2,500 Not Implemented
UD0713 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $1,021 $3,807 Implemented
UD0713 # 04 Y:2005 04 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $15,628 $3,900 Not Implemented
LM0009 # 05 Y:2001 05 2001 $1,277,400 $300,000 n/a