Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
80
matching recommendationsSIC | 3822 | Environmental Controls |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0306 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $158 | $432 | Implemented |
IC0306 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,340 | $0 | Implemented |
IC0306 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $21,638 | $33,160 | Implemented |
IC0306 # 03 Y:2024 | 03 | 2024 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $2,629 | $118 | Not Implemented |
IC0306 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $22,099 | $10,776 | Not Implemented |
IC0306 # 08 Y:2024 | 08 | 2024 | INSULATE BARE EQUIPMENT | $41,459 | $20,803 | Not Implemented |
IC0306 # 07 Y:2024 | 07 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,874 | $10,418 | Not Implemented |
IC0306 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $274,832 | $1,429,458 | Not Implemented |
NC0387 # 03 Y:2009 | 03 | 2009 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $44,613 | $45,000 | Not Implemented |
NC0387 # 06 Y:2009 | 06 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,447 | $100 | Implemented |
NC0387 # 05 Y:2009 | 05 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,105 | $7,000 | Not Implemented |
NC0387 # 04 Y:2009 | 04 | 2009 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $21,000 | $25,000 | Not Implemented |
NC0387 # 02 Y:2009 | 02 | 2009 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $51,343 | $72,000 | Not Implemented |
NC0387 # 01 Y:2009 | 01 | 2009 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $202,240 | $400,000 | Not Implemented |
NC0387 # 09 Y:2009 | 09 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $712 | $351 | Not Implemented |
NC0387 # 08 Y:2009 | 08 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $44,156 | $85,555 | Implemented |
NC0387 # 07 Y:2009 | 07 | 2009 | DEVELOP A REPAIR/REPLACE POLICY | $2,019 | $2,198 | Not Implemented |
UD0713 # 02 Y:2005 | 02 | 2005 | USE OPTIMUM TEMPERATURE | $64,754 | $2,500 | Not Implemented |
UD0713 # 06 Y:2005 | 06 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,925 | $200 | Implemented |
UD0713 # 07 Y:2005 | 07 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $1,021 | $3,807 | Implemented |
UD0713 # 04 Y:2005 | 04 | 2005 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $15,628 | $3,900 | Not Implemented |
UD0713 # 05 Y:2005 | 05 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,868 | $22,600 | Not Implemented |
UD0713 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,435 | $41,783 | Implemented |
UD0713 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $84,867 | $94,373 | Not Implemented |
LM0009 # 03 Y:2001 | 03 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,805 | $12,000 | n/a |