Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
187
matching recommendationsSIC | 3841 | Surgical And Medical Instruments |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0416 # 02 Y:2022 | 02 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,412 | $20,515 | Implemented |
MI0416 # 01 Y:2022 | 01 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $25,300 | $580 | Implemented |
UF0583 # 06 Y:2022 | 06 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $58,774 | $10,000 | Not Implemented |
UF0583 # 05 Y:2022 | 05 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $273,973 | $0 | Not Implemented |
UF0583 # 04 Y:2022 | 04 | 2022 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $13,240 | $0 | Implemented |
UF0583 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,746 | $33,000 | Implemented |
UF0583 # 02 Y:2022 | 02 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $44,987 | $62,001 | Implemented |
UF0583 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $308,276 | $1,243,750 | Implemented |
MI0405 # 01 Y:2022 | 01 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $51,243 | $208,000 | Implemented |
MI0405 # 03 Y:2022 | 03 | 2022 | USE SOLAR HEAT TO HEAT WATER | $22,766 | $62,612 | Not Implemented |
MI0405 # 04 Y:2022 | 04 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,041 | $580 | Not Implemented |
MI0405 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $3,954 | $3,600 | Implemented |
MI0405 # 06 Y:2022 | 06 | 2022 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $874 | $900 | Not Implemented |
MI0405 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,714 | $39,398 | Implemented |
MI0337 # 04 Y:2018 | 04 | 2018 | INSULATE BARE EQUIPMENT | $26,104 | $3,000 | Implemented |
MI0337 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,197 | $11,846 | Not Implemented |
MI0337 # 02 Y:2018 | 02 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $41,184 | $480 | Implemented |
MI0337 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $45,349 | $76,979 | Implemented |
MI0337 # 05 Y:2018 | 05 | 2018 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $24,458 | $31,600 | Not Implemented |
MI0337 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,813 | $2,030 | Implemented |
MI0337 # 11 Y:2018 | 11 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,571 | $6,578 | Implemented |
MI0337 # 10 Y:2018 | 10 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,724 | $7,314 | Implemented |
MI0337 # 08 Y:2018 | 08 | 2018 | INSTALL OCCUPANCY SENSORS | $14,515 | $19,215 | Implemented |
MI0337 # 06 Y:2018 | 06 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $21,780 | $78,320 | Not Implemented |
MI0337 # 09 Y:2018 | 09 | 2018 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,557 | $2,528 | Not Implemented |