IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

252

matching recommendations
Reset
SIC 3842 Surgical Appliances And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0209 # 05 Y:2022 05 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,347 $1,395 Implemented
UU0209 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,279 $1,600 Implemented
UU0209 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,311 $900 Implemented
UU0209 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,206 $5,920 Implemented
UF0584 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,855 $40,432 Implemented
UF0584 # 10 Y:2022 10 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $68,493 $0 Implemented
NC0650 # 05 Y:2020 05 2020 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $955 $2,350 Implemented
NC0650 # 03 Y:2020 03 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $2,430 $997 Implemented
NC0650 # 06 Y:2020 06 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,730 $1,200 Implemented
NC0650 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,314 $20,000 Implemented
UD0993 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $2,531 $2,940 Implemented
UD0993 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,977 $9,300 Implemented
UF0518 # 06 Y:2018 06 2018 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $109,000 $41,200 Implemented
UF0518 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,401 $0 Implemented
UF0518 # 05 Y:2018 05 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,145 $9,600 Implemented
UF0518 # 01 Y:2018 01 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $24,028 $167,216 Implemented
UF0518 # 03 Y:2018 03 2018 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,844 $586 Implemented
UF0518 # 02 Y:2018 02 2018 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $9,684 $1,980 Implemented
MI0336 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,939 $48,821 Implemented
MI0336 # 01 Y:2018 01 2018 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $21,620 $80 Implemented
MI0336 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,664 $11,634 Implemented
MI0336 # 09 Y:2018 09 2018 INSTALL OCCUPANCY SENSORS $492 $1,466 Implemented
MI0336 # 06 Y:2018 06 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,709 $2,800 Implemented
MI0336 # 03 Y:2018 03 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $17,738 $3,280 Implemented
TT0208 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,089 $400 Implemented