IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 3842 Surgical Appliances And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0584 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,855 $40,432 Implemented
UF0584 # 10 Y:2022 10 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $68,493 $0 Implemented
UF0518 # 01 Y:2018 01 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $24,028 $167,216 Implemented
UF0518 # 03 Y:2018 03 2018 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,844 $586 Implemented
UF0518 # 02 Y:2018 02 2018 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $9,684 $1,980 Implemented
UF0518 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,401 $0 Implemented
UF0518 # 05 Y:2018 05 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,145 $9,600 Implemented
UF0518 # 06 Y:2018 06 2018 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $109,000 $41,200 Implemented
MI0336 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,664 $11,634 Implemented
MI0336 # 03 Y:2018 03 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $17,738 $3,280 Implemented
MI0336 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,939 $48,821 Implemented
MI0336 # 01 Y:2018 01 2018 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $21,620 $80 Implemented
MI0336 # 06 Y:2018 06 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,709 $2,800 Implemented
MI0336 # 09 Y:2018 09 2018 INSTALL OCCUPANCY SENSORS $492 $1,466 Implemented
MI0290 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $81,253 $1,120 Implemented
MI0290 # 02 Y:2016 02 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $50,831 $40 Implemented
MI0290 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,730 $16,200 Implemented
MI0290 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $3,248 $2,165 Implemented
MI0290 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,622 $40 Implemented
MI0290 # 10 Y:2016 10 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,792 $280 Implemented
MI0290 # 11 Y:2016 11 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,703 $1,080 Implemented
MI0290 # 14 Y:2016 14 2016 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $396 $317 Implemented
MI0241 # 08 Y:2013 08 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,942 $2,196 Implemented
MI0241 # 11 Y:2013 11 2013 INSULATE BARE EQUIPMENT $686 $1,520 Implemented
MI0241 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $11,217 $6,000 Implemented