IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 3844 X-ray Apparatus And Tubes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0109 # 06 Y:2006 06 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $32,510 $249,000 Not Implemented
UU0109 # 05 Y:2006 05 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $3,360 $2,960 Not Implemented
UU0109 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,040 $90 Not Implemented
UU0109 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,730 $970 Not Implemented
UU0109 # 02 Y:2006 02 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $24,880 $20,000 Not Implemented
UU0109 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $1,800 $2,220 Not Implemented
AM0503 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,600 $500 Implemented
AM0503 # 01 Y:2006 01 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $16,230 $33,000 Not Implemented
AM0503 # 03 Y:2006 03 2006 OPTIMIZE PLANT POWER FACTOR $6,550 $17,100 Not Implemented
AM0503 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,320 $300 Implemented
AM0503 # 07 Y:2006 07 2006 USE SYNTHETIC LUBRICANT $256 $0 Not Implemented
AM0503 # 06 Y:2006 06 2006 REUSE RAGS UNTIL COMPLETELY SOILED $880 $0 Not Implemented
AM0503 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $930 $27 Implemented
WI0390 # 09 Y:2001 09 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $161 $640 Implemented
WI0390 # 01 Y:2001 01 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,897 $0 Implemented
WI0390 # 02 Y:2001 02 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,828 $9,500 Not Implemented
WI0390 # 03 Y:2001 03 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,958 $0 Not Implemented
WI0390 # 04 Y:2001 04 2001 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,118 $6,350 Not Implemented
WI0390 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $584 $238 Implemented
WI0390 # 06 Y:2001 06 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $138 $0 Implemented
WI0390 # 07 Y:2001 07 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $481 $0 Implemented
WI0390 # 08 Y:2001 08 2001 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $397 $0 Implemented
WI0253 # 03 Y:1995 03 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,174 $0 n/a
WI0253 # 09 Y:1995 09 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,860 $0 n/a
WI0253 # 08 Y:1995 08 1995 INSULATE BARE EQUIPMENT $369 $49 n/a