Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsSIC | 3844 | X-ray Apparatus And Tubes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0241 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,075 | $5,000 | n/a |
DL0241 # 02 Y:2024 | 02 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $7,985 | $4,420 | n/a |
DL0241 # 01 Y:2024 | 01 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $30,655 | $117,000 | n/a |
UU0109 # 06 Y:2006 | 06 | 2006 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $32,510 | $249,000 | Not Implemented |
UU0109 # 05 Y:2006 | 05 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,360 | $2,960 | Not Implemented |
UU0109 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,040 | $90 | Not Implemented |
UU0109 # 03 Y:2006 | 03 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,730 | $970 | Not Implemented |
UU0109 # 02 Y:2006 | 02 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $24,880 | $20,000 | Not Implemented |
UU0109 # 01 Y:2006 | 01 | 2006 | OPTIMIZE PLANT POWER FACTOR | $1,800 | $2,220 | Not Implemented |
AM0503 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,600 | $500 | Implemented |
AM0503 # 01 Y:2006 | 01 | 2006 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $16,230 | $33,000 | Not Implemented |
AM0503 # 03 Y:2006 | 03 | 2006 | OPTIMIZE PLANT POWER FACTOR | $6,550 | $17,100 | Not Implemented |
AM0503 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,320 | $300 | Implemented |
AM0503 # 07 Y:2006 | 07 | 2006 | USE SYNTHETIC LUBRICANT | $256 | $0 | Not Implemented |
AM0503 # 06 Y:2006 | 06 | 2006 | REUSE RAGS UNTIL COMPLETELY SOILED | $880 | $0 | Not Implemented |
AM0503 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $930 | $27 | Implemented |
WI0390 # 09 Y:2001 | 09 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $161 | $640 | Implemented |
WI0390 # 01 Y:2001 | 01 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,897 | $0 | Implemented |
WI0390 # 02 Y:2001 | 02 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,828 | $9,500 | Not Implemented |
WI0390 # 03 Y:2001 | 03 | 2001 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,958 | $0 | Not Implemented |
WI0390 # 04 Y:2001 | 04 | 2001 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,118 | $6,350 | Not Implemented |
WI0390 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $584 | $238 | Implemented |
WI0390 # 06 Y:2001 | 06 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $138 | $0 | Implemented |
WI0390 # 07 Y:2001 | 07 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $481 | $0 | Implemented |
WI0390 # 08 Y:2001 | 08 | 2001 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $397 | $0 | Implemented |