IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

120

matching recommendations
Reset
SIC 3845 Electromedical Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0350 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,408 $0 Implemented
SU0350 # 07 Y:2013 07 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $579 $340 Implemented
SU0350 # 06 Y:2013 06 2013 INSULATE FEEDWATER TANK $579 $190 Implemented
SU0296 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,948 $0 Not Implemented
SU0296 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,680 $5,928 Not Implemented
SU0296 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,753 $554 Not Implemented
SU0296 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $81,934 $0 Implemented
SU0296 # 07 Y:2010 07 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $71,218 $132,133 Not Implemented
SU0296 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $540 $793 Not Implemented
SU0296 # 06 Y:2010 06 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $79,942 $129,646 Implemented
SU0296 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $758 $447 Implemented
SU0296 # 08 Y:2010 08 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $373 $732 Not Implemented
SU0296 # 10 Y:2010 10 2010 OPTIMIZE PLANT POWER FACTOR $1,823 $8,254 Not Implemented
MI0186 # 06 Y:2009 06 2009 DISCONNECT BALLASTS $3,090 $900 Not Implemented
MI0186 # 05 Y:2009 05 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $24,293 $1,600 Not Implemented
MI0186 # 04 Y:2009 04 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $56,948 $10,000 Implemented
MI0186 # 01 Y:2009 01 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $160,282 $0 Implemented
MI0186 # 02 Y:2009 02 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $110,625 $4,000 Implemented
MI0186 # 03 Y:2009 03 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $76,266 $28,000 Not Implemented
MI0181 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $218,599 $25,000 Implemented
MI0181 # 02 Y:2009 02 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $143,524 $2,000 Implemented
MI0181 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $62,935 $60,000 Not Implemented
MI0181 # 04 Y:2009 04 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $50,254 $2,000 Implemented
MI0181 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,674 $1,210 Implemented
MI0181 # 06 Y:2009 06 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,403 $4,531 Not Implemented