Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 387 | Watches, Clocks, Watchcases & Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0503 # 07 Y:2005 | 07 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,742 | $4,900 | Not Implemented |
WI0503 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,350 | $640 | Not Implemented |
WI0503 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,506 | $0 | Not Implemented |
WI0503 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,112 | $1,000 | Not Implemented |
WI0503 # 03 Y:2005 | 03 | 2005 | USE OPTIMUM THICKNESS INSULATION | $8,005 | $7,500 | Not Implemented |
WI0503 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,209 | $21,960 | Not Implemented |
WI0503 # 01 Y:2005 | 01 | 2005 | IMPROVE SPACE COMFORT CONDITIONING | $47,772 | $9,625 | Not Implemented |
GT0652 # 03 Y:1998 | 03 | 1998 | INSTALL STEAM TRAP | $2,103 | $2,800 | n/a |
GT0652 # 07 Y:1998 | 07 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,430 | $130,994 | n/a |
GT0652 # 06 Y:1998 | 06 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,300 | $0 | n/a |
GT0652 # 05 Y:1998 | 05 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $10,000 | $250 | n/a |
GT0652 # 04 Y:1998 | 04 | 1998 | UTILIZE OUTSIDE CONTRACTING | $4,345 | $0 | n/a |
GT0652 # 02 Y:1998 | 02 | 1998 | METER WASTE WATER | $6,890 | $1,000 | n/a |
GT0652 # 01 Y:1998 | 01 | 1998 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $9,935 | $0 | n/a |
NC0081 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,438 | $17,250 | Implemented |
NC0081 # 10 Y:1996 | 10 | 1996 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,170 | $25,000 | Not Implemented |
NC0081 # 09 Y:1996 | 09 | 1996 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $9,000 | $8,000 | Not Implemented |
NC0081 # 08 Y:1996 | 08 | 1996 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,816 | $0 | Not Implemented |
NC0081 # 07 Y:1996 | 07 | 1996 | AIR CONDITION ONLY SPACE NECESSARY | $968 | $1,500 | Not Implemented |
NC0081 # 06 Y:1996 | 06 | 1996 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $9,258 | $25,000 | Implemented |
NC0081 # 05 Y:1996 | 05 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,626 | $2,640 | Implemented |
NC0081 # 04 Y:1996 | 04 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $558 | $480 | Implemented |
NC0081 # 03 Y:1996 | 03 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,043 | $53,739 | Implemented |
NC0081 # 01 Y:1996 | 01 | 1996 | DISCONNECT BALLASTS | $800 | $2,060 | Implemented |
AR0026 # 01 Y:1994 | 01 | 1994 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $864 | $224 | Implemented |