IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2311 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,574 $6,440 Implemented
GT0869 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $352 $0 Implemented
GT0869 # 01 Y:2009 01 2009 REPAIR AND ELIMINATE STEAM LEAKS $7,130 $2,100 Implemented
GT0869 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,586 $42,920 Implemented
GT0869 # 03 Y:2009 03 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,117 $890 Implemented
GT0726 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $377 $1,000 Implemented
GT0726 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,034 $3,696 Implemented
GT0726 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $115 $185 Implemented
GT0713 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,580 $3,750 Implemented
GT0713 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,175 $200 Implemented
GT0713 # 02 Y:2001 02 2001 USE POWER DURING OFF-PEAK PERIODS $2,767 $0 Implemented
GT0599 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,100 $600 Implemented
GT0599 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,459 $2,640 Implemented
GT0599 # 01 Y:1996 01 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,660 $18,860 Implemented
GT0489 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,410 $9,100 Implemented
GT0415 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $630 $200 Implemented
GT0415 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $627 $254 Implemented
GT0415 # 02 Y:1990 02 1990 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,460 $0 Implemented
GT0415 # 01 Y:1990 01 1990 REDUCE VENTILATION AIR $216 $2,220 Implemented
GT0264 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,470 $1,000 Implemented
GT0264 # 08 Y:1985 08 1985 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $2,920 $5,000 Implemented
GT0264 # 06 Y:1985 06 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,130 $5,500 Implemented
GT0264 # 05 Y:1985 05 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $320 $0 Implemented
GT0264 # 04 Y:1985 04 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $294 $2,198 Implemented
GT0260 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,084 $500 Implemented