Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 39 | Miscellaneous Manufacturing Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0798 # 05 Y:2019 | 05 | 2019 | INSULATE BARE EQUIPMENT | $3,333 | $1,801 | Implemented |
MA0798 # 02 Y:2019 | 02 | 2019 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $18,484 | $80,000 | Implemented |
MA0798 # 09 Y:2019 | 09 | 2019 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $512 | $200 | Implemented |
MA0798 # 07 Y:2019 | 07 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,849 | $2,001 | Implemented |
MA0798 # 01 Y:2019 | 01 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,625 | $48,500 | Implemented |
MAS017 # 01 Y:2012 | 01 | 2012 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $34,566 | $10,000 | Implemented |
MAS016 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,510 | $5,600 | Implemented |
MAS016 # 03 Y:2012 | 03 | 2012 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $9,910 | $0 | Implemented |
MA0532 # 07 Y:2003 | 07 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,580 | $0 | Implemented |
MA0532 # 06 Y:2003 | 06 | 2003 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,627 | $1,845 | Implemented |
MA0532 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,385 | $4,400 | Implemented |
MA0532 # 04 Y:2003 | 04 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,606 | $4,400 | Implemented |
MA0532 # 03 Y:2003 | 03 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,833 | $0 | Implemented |
MA0532 # 01 Y:2003 | 01 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $67,039 | $7,300 | Implemented |
MA0306 # 07 Y:1994 | 07 | 1994 | INSTALL / REPAIR INSULATION ON STEAM LINES | $757 | $434 | Implemented |
MA0306 # 04 Y:1994 | 04 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,761 | $5,827 | Implemented |
MA0306 # 03 Y:1994 | 03 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,696 | $0 | Implemented |
MA0306 # 02 Y:1994 | 02 | 1994 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $6,295 | $6,831 | Implemented |
MA0306 # 01 Y:1994 | 01 | 1994 | BURN A LESS EXPENSIVE GRADE OF FUEL | $29,061 | $21,690 | Implemented |
MA0202 # 04 Y:1991 | 04 | 1991 | REDUCE HEAT GAIN BY WINDOW TINTING | $9,467 | $37,380 | Implemented |
MA0202 # 03 Y:1991 | 03 | 1991 | INSULATE BARE EQUIPMENT | $196 | $0 | Implemented |
MA0202 # 02 Y:1991 | 02 | 1991 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $2,469 | $2,800 | Implemented |
MA0202 # 01 Y:1991 | 01 | 1991 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $458 | $1,012 | Implemented |
MA0106 # 03 Y:1987 | 03 | 1987 | REPAIR OR REPLACE STEAM TRAPS | $1,717 | $3,445 | Implemented |
MA0106 # 01 Y:1987 | 01 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $334 | $129 | Implemented |