Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsSIC | 39 | Miscellaneous Manufacturing Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0396 # 10 Y:2015 | 10 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $419 | $0 | Implemented |
SU0396 # 08 Y:2015 | 08 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,009 | $17,408 | Implemented |
SU0396 # 06 Y:2015 | 06 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $17,027 | $20,360 | Implemented |
SU0396 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,889 | $930 | Implemented |
SU0396 # 04 Y:2015 | 04 | 2015 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $243 | $0 | Implemented |
SU0396 # 02 Y:2015 | 02 | 2015 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $738 | $0 | Implemented |
SU0396 # 01 Y:2015 | 01 | 2015 | PAY BILLS ON TIME TO AVOID LATE FEES | $813 | $0 | Implemented |
SU0193 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $942 | $363 | Implemented |
SU0193 # 08 Y:2004 | 08 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,989 | $10,421 | Implemented |
SU0193 # 04 Y:2004 | 04 | 2004 | USE SYNTHETIC LUBRICANT | $1,343 | $200 | Implemented |
SU0193 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $489 | $304 | Implemented |
SU0193 # 01 Y:2004 | 01 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,858 | $0 | Implemented |
SU0193 # 03 Y:2004 | 03 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,396 | $0 | Implemented |
SU0193 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,779 | $0 | Implemented |
SU0155 # 10 Y:2003 | 10 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $381 | $500 | Implemented |
SU0155 # 07 Y:2003 | 07 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,755 | $320 | Implemented |
SU0155 # 05 Y:2003 | 05 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $4,016 | $0 | Implemented |
SU0155 # 04 Y:2003 | 04 | 2003 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $4,056 | $0 | Implemented |
SU0155 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $17,787 | $1,200 | Implemented |
SU0155 # 11 Y:2003 | 11 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $326 | $0 | Implemented |
SU0105 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $993 | $123 | Implemented |
SU0105 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $258 | $0 | Implemented |
SU0105 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $264 | $90 | Implemented |
SU0105 # 01 Y:2001 | 01 | 2001 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,365 | $0 | Implemented |
SU0102 # 03 Y:2001 | 03 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $758 | $1,323 | Implemented |