IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0171 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $682 $2,268 Implemented
WM0171 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,567 $844 Implemented
WM0171 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,815 $1,500 Implemented
WM0171 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,582 $3,000 Implemented
WM0170 # 02 Y:2021 02 2021 INSTALL SPECTRAL REFLECTORS / DELAMP $4,328 $3,000 Implemented
WM0170 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $5,931 $24,300 Implemented
WM0170 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,851 $3,500 Implemented
WM0170 # 08 Y:2021 08 2021 INSTALL OCCUPANCY SENSORS $216 $260 Implemented
WM0170 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $330 $182 Implemented
WM0137 # 08 Y:2019 08 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $629 $1,920 Implemented
WM0137 # 05 Y:2019 05 2019 USE RADIANT HEATER FOR SPOT HEATING $2,291 $2,780 Implemented
WM0137 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,626 $15,385 Implemented
WM0074 # 02 Y:2015 02 2015 CONDENSE OPERATION INTO ONE BUILDING $2,174 $0 Implemented
WM0074 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $784 $225 Implemented
WM0074 # 09 Y:2015 09 2015 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,625 $1,774 Implemented
WM0037 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $168 $205 Implemented
WM0009 # 03 Y:2012 03 2012 USE RADIANT HEATER FOR SPOT HEATING $3,162 $2,448 Implemented
WM0009 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $259 $200 Implemented
WI0301 # 03 Y:1997 03 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $10,763 $23,000 Implemented
WI0301 # 07 Y:1997 07 1997 INSULATE BARE EQUIPMENT $768 $998 Implemented
WI0270 # 10 Y:1996 10 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $92 $0 Implemented
WI0270 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,194 $1,800 Implemented
WI0270 # 03 Y:1996 03 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,559 $1,550 Implemented
WI0270 # 01 Y:1996 01 1996 INSTALL TIMERS AND/OR THERMOSTATS $2,808 $600 Implemented
WI0262 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,821 $0 Implemented