Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
58
matching recommendationsSIC | 3931 | Musical Instruments |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0164 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,851 | $1,271 | Implemented |
IP0164 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,709 | $1,228 | Implemented |
IP0164 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $216 | $803 | Implemented |
IP0164 # 06 Y:2022 | 06 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $972 | $1,279 | Implemented |
IP0164 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,649 | $1,428 | Implemented |
SD0553 # 08 Y:2017 | 08 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,656 | $3,225 | Implemented |
SD0553 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,930 | $7,400 | Implemented |
SD0553 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,203 | $59,750 | Implemented |
SD0553 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,252 | $39,079 | Implemented |
LL0294 # 04 Y:2008 | 04 | 2008 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,897 | $1,210 | Implemented |
LL0294 # 08 Y:2008 | 08 | 2008 | INSTALL OCCUPANCY SENSORS | $645 | $90 | Implemented |
CO0535 # 03 Y:2003 | 03 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $7,160 | $15,760 | Implemented |
CO0535 # 02 Y:2003 | 02 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,820 | $6,420 | Implemented |
CO0535 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,340 | $750 | Implemented |
CO0535 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,250 | $9,690 | Implemented |
CO0535 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $411 | $112 | Implemented |
LE0108 # 02 Y:2001 | 02 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,248 | $0 | Implemented |
LE0108 # 04 Y:2001 | 04 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $315 | $500 | Implemented |
LE0108 # 03 Y:2001 | 03 | 2001 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $2,738 | $3,120 | Implemented |
GT0713 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,580 | $3,750 | Implemented |
GT0713 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,175 | $200 | Implemented |
GT0713 # 02 Y:2001 | 02 | 2001 | USE POWER DURING OFF-PEAK PERIODS | $2,767 | $0 | Implemented |
MO0279 # 08 Y:2000 | 08 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,160 | $486 | Implemented |
MO0279 # 07 Y:2000 | 07 | 2000 | AUTOMATE FINISHING PROCESS | $6,240 | $205 | Implemented |
MO0279 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $508 | $1,251 | Implemented |