IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 3999 Manufacturing Industries, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0327 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,903 $17,890 Implemented
MZ0327 # 02 Y:2022 02 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $31,637 $25,442 Implemented
MZ0327 # 01 Y:2022 01 2022 INSTALL OCCUPANCY SENSORS $299 $960 Implemented
MZ0271 # 04 Y:2019 04 2019 USE COMPRESSOR AIR FILTERS $764 $150 Implemented
MZ0271 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $4,334 $980 Implemented
MO0248 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,190 $80 Implemented
MO0248 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,629 $6,698 Implemented
MO0248 # 02 Y:1999 02 1999 MODIFY STARTUP/SHUTDOWN TIMES $59,125 $0 Implemented
MO0248 # 01 Y:1999 01 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $102,637 $208,000 Implemented
MO0242 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,422 $4,634 Implemented
MO0242 # 07 Y:1998 07 1998 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $126 $0 Implemented
MO0242 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,073 $120 Implemented
MO0242 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,386 $5,555 Implemented
MO0242 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $489 $345 Implemented
MO0115 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,443 $911 Implemented
MO0016 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164 $45 Implemented
MO0016 # 07 Y:1991 07 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $10 $210 Implemented
MO0016 # 06 Y:1991 06 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $18 $3 Implemented
MO0016 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $41 $0 Implemented
MO0016 # 04 Y:1991 04 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $138 $150 Implemented
MO0016 # 03 Y:1991 03 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $383 $1,145 Implemented
MO0016 # 02 Y:1991 02 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $440 $1,095 Implemented