IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
SIC 422 Public Warehousing And Storage
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0523 # 01 Y:2022 01 2022 DISCONNECT BALLASTS $4,994 $0 Not Implemented
SU0523 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,899 $250 Not Implemented
SU0523 # 08 Y:2022 08 2022 REDUCE VENTILATION AIR $346 $1,265 Not Implemented
SU0523 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $1,859 $2,600 Not Implemented
SU0523 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $659 $19 Not Implemented
SU0523 # 04 Y:2022 04 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,907 $675 Not Implemented
SU0523 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $652 $567 Not Implemented
SU0523 # 07 Y:2022 07 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $125 $325 Not Implemented
SU0523 # 09 Y:2022 09 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $8,763 $47,904 Not Implemented
CW0124 # 03 Y:2022 03 2022 USER BATTERY STORAGE FOR POWER QUALITY ISSUES $230,341 $287,555 n/a
CW0124 # 07 Y:2022 07 2022 REPLACE TREATED WATER WITH WELL / SURFACE WATER $1,505 $2,582 n/a
CW0124 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $929 $1,866 n/a
CW0124 # 05 Y:2022 05 2022 MODIFY WORKLOAD $16,860 $0 n/a
CW0124 # 04 Y:2022 04 2022 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $7,380 $0 n/a
CW0124 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,378 $47,373 n/a
CW0124 # 01 Y:2022 01 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,407 $100 n/a
AS0527 # 01 Y:2022 01 2022 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $1,896 $1,099 Implemented
AS0527 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150 $317 Implemented
AS0527 # 03 Y:2022 03 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $638 $115 Implemented
AS0527 # 02 Y:2022 02 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,264 $2,187 Implemented
WV0625 # 02 Y:2022 02 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $28,641 $112,444 Not Implemented
WV0625 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,687 $17,469 Not Implemented
WV0625 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,879 $893 Implemented
WV0625 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $73,145 $29,680 Implemented
WV0625 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $3,011 $6,065 Not Implemented