IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 47 Transportation Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0580 # 09 Y:2022 09 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,516 $594 Implemented
UF0580 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $10,501 Implemented
UF0580 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $3,037 $2,270 Implemented
UF0580 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,465 $8,588 Implemented
UF0580 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $44,200 $57,498 Implemented
UF0580 # 03 Y:2022 03 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $18,832 $31,696 Implemented
UF0580 # 04 Y:2022 04 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,115 $20,214 Implemented
DL0205 # 04 Y:2022 04 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $15,368 $0 Implemented
DL0204 # 02 Y:2022 02 2022 USE OPTIMUM TEMPERATURE $1,182 $0 Implemented
DL0204 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $491 $45 Implemented
DL0204 # 07 Y:2022 07 2022 ADJUST VENTS TO MINIMIZE ENERGY USE $836 $465 Implemented
DL0202 # 02 Y:2021 02 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,593 $750 Implemented
DL0202 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $870 $0 Implemented
DL0202 # 04 Y:2021 04 2021 BURN WASTE OIL FOR HEAT $12,350 $5,000 Implemented
DL0202 # 03 Y:2021 03 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,460 $1,000 Implemented
DL0202 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,105 $0 Implemented
TT0257 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,573 $3,100 Implemented
TT0257 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,293 $0 Implemented
TT0257 # 01 Y:2021 01 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $185,939 $360 Implemented
TT0255 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,816 $1,640 Implemented
TT0255 # 03 Y:2021 03 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,336 $24,200 Implemented
TT0255 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,140 $7,200 Implemented
BD0450 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,837 $1,000 Implemented
BD0450 # 04 Y:2014 04 2014 UPGRADE OBSOLETE EQUIPMENT $2,486 $20 Implemented
BD0450 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,148 $2,850 Implemented