IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 478 Miscellaneous Transportation Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0257 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,573 $3,100 Implemented
TT0257 # 04 Y:2021 04 2021 RECOVER WASTE HEAT FROM EQUIPMENT $4,957 $12,180 Not Implemented
TT0257 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,982 $7,100 Not Implemented
TT0257 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,293 $0 Implemented
TT0257 # 01 Y:2021 01 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $185,939 $360 Implemented
TT0255 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,140 $7,200 Implemented
TT0255 # 03 Y:2021 03 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,336 $24,200 Implemented
TT0255 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $32,997 $1,640 Not Implemented
TT0255 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,816 $1,640 Implemented
BD0450 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,234 $24,940 Not Implemented
BD0450 # 01 Y:2014 01 2014 USE RADIANT HEATER FOR SPOT HEATING $19,966 $27,000 Not Implemented
BD0450 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,837 $1,000 Implemented
BD0450 # 04 Y:2014 04 2014 UPGRADE OBSOLETE EQUIPMENT $2,486 $20 Implemented
BD0450 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,148 $2,850 Implemented
BD0450 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,909 $1,025 Not Implemented
BD0450 # 07 Y:2014 07 2014 USE PHOTOCELL CONTROLS $777 $450 Not Implemented
BD0450 # 08 Y:2014 08 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $461 $320 Not Implemented
BD0450 # 09 Y:2014 09 2014 INSTALL OCCUPANCY SENSORS $406 $750 Not Implemented
BD0450 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $322 $143 Not Implemented
SD0429 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $340 $100 Implemented
SD0429 # 06 Y:2010 06 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $194 $500 Not Implemented
SD0429 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $945 $2,000 Not Implemented
SD0429 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,424 $2,000 Not Implemented
SD0429 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $1,115 $587 Not Implemented
SD0429 # 01 Y:2010 01 2010 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,033 $100 Not Implemented