Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
81
matching recommendationsSIC | 49 | Electric, Gas, And Sanitary Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0182 # 01 Y:2021 | 01 | 2021 | SELL COMBUSTIBLE WASTE | $358,314 | $840,585 | Implemented |
UU0182 # 04 Y:2021 | 04 | 2021 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $69,301 | $172,000 | Not Implemented |
UU0182 # 03 Y:2021 | 03 | 2021 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $94,872 | $621,000 | Not Implemented |
UU0182 # 02 Y:2021 | 02 | 2021 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $301,212 | $427,040 | Implemented |
UU0182 # 05 Y:2021 | 05 | 2021 | INSULATE BARE EQUIPMENT | $5,611 | $2,229 | Not Implemented |
UU0182 # 06 Y:2021 | 06 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,360 | $920 | Implemented |
UU0183 # 01 Y:2021 | 01 | 2021 | SELL COMBUSTIBLE WASTE | $149,294 | $144,000 | Implemented |
UU0183 # 02 Y:2021 | 02 | 2021 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $118,667 | $7,000 | Not Implemented |
UU0183 # 06 Y:2021 | 06 | 2021 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $15,681 | $1,607 | Implemented |
UU0183 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $100,049 | $157,500 | Not Implemented |
UU0183 # 04 Y:2021 | 04 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $35,893 | $14,200 | Not Implemented |
UU0183 # 05 Y:2021 | 05 | 2021 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $19,111 | $20,527 | Implemented |
UU0183 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,906 | $22,506 | Implemented |
UU0183 # 08 Y:2021 | 08 | 2021 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $794 | $1,175 | Not Implemented |
UU0169 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,976 | $124,680 | Implemented |
UU0169 # 02 Y:2020 | 02 | 2020 | USE EXISTING DAM TO GENERATE ELECTRICITY | $24,451 | $120,000 | Not Implemented |
UU0169 # 03 Y:2020 | 03 | 2020 | USE OPTIMUM TEMPERATURE | $4,303 | $0 | Implemented |
UU0169 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $514 | $2,100 | Implemented |
UU0168 # 04 Y:2020 | 04 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,063 | $0 | Implemented |
UU0168 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $251 | $0 | Implemented |
UU0168 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $178 | $0 | Implemented |
UU0168 # 03 Y:2020 | 03 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,221 | $8,000 | Not Implemented |
UU0168 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,729 | $15,550 | Implemented |
UU0168 # 01 Y:2020 | 01 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,906 | $0 | Implemented |
UU0164 # 04 Y:2020 | 04 | 2020 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $750 | $750 | Not Implemented |