IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,323

matching recommendations
Reset
SIC 49 Electric, Gas, And Sanitary Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0062 # 01 Y:2022 01 2022 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $45,354 $242,300 Not Implemented
NL0062 # 02 Y:2022 02 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,581 $24,336 Implemented
NL0062 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,498 $18,517 Implemented
NL0062 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,413 $660 Implemented
NL0062 # 05 Y:2022 05 2022 RECOVER AND REUSE WASTE MATERIAL $1,313 $440 Not Implemented
NL0062 # 06 Y:2022 06 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,261 $918 Not Implemented
NL0062 # 07 Y:2022 07 2022 AIR CONDITION ONLY SPACE NECESSARY $424 $50,000 Implemented
AM0836 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $12,100 $11,315 Implemented
AM0836 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $6,240 $8,070 Implemented
AM0836 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,850 $890 Implemented
AM0836 # 04 Y:2022 04 2022 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $1,270 $2,420 Implemented
AM0836 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $570 $1,820 Implemented
AM0836 # 06 Y:2022 06 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $167 $35 Implemented
TT0264 # 01 Y:2022 01 2022 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $179,945 $100,000 Implemented
TT0264 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,057 $60,000 Implemented
TT0264 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,609 $36,617 Not Implemented
TT0264 # 04 Y:2022 04 2022 INSTALL TIMERS AND/OR THERMOSTATS $475 $700 Not Implemented
AM0831 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $10,140 $16,600 Implemented
AM0831 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $318 $1,243 Implemented
AM0831 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $29 $111 Implemented
OK1058 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $1,800 $3,000 Not Implemented
OK1058 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $455 $2,130 Not Implemented
OK1058 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,252 $7,778 Implemented
OK1058 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $185 $700 Implemented
SF0576 # 01 Y:2021 01 2021 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $15,824 $0 Not Implemented