IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,323

matching recommendations
Reset
SIC 49 Electric, Gas, And Sanitary Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0576 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,886 $120 Implemented
SF0576 # 03 Y:2021 03 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,092 $14,612 Implemented
SF0576 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,261 $17,288 Implemented
SF0576 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,882 $28,653 Implemented
SF0576 # 06 Y:2021 06 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $41,072 $554,541 Implemented
SF0576 # 07 Y:2021 07 2021 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $168,685 $1,228,444 Not Implemented
SD0617 # 01 Y:2021 01 2021 UPGRADE OBSOLETE EQUIPMENT $387,076 $608,562 Implemented
SD0617 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $101,052 $3,024,848 Implemented
SD0617 # 03 Y:2021 03 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $27,764 $41,000 Implemented
SD0617 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $463 $378 Not Implemented
OK1056 # 01 Y:2021 01 2021 RECOVER AND REUSE WASTE MATERIAL $10,400 $0 Not Implemented
OK1056 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,775 $3,987 Not Implemented
OK1056 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $425 $629 Implemented
OK1056 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46 $162 Implemented
UA0244 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,477 $3,209 Implemented
UA0244 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $893 $282 Not Implemented
UA0244 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,839 $180,000 Not Implemented
UA0244 # 04 Y:2021 04 2021 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $283,379 $2,501,328 Not Implemented
UA0244 # 05 Y:2021 05 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $117,530 $1,000 Not Implemented
UF0568 # 01 Y:2021 01 2021 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $52,474 $147,852 Not Implemented
UF0568 # 02 Y:2021 02 2021 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $20,147 $49,165 Implemented
UF0568 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,182 $12,247 Implemented
UF0568 # 04 Y:2021 04 2021 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $8,146 $700 Not Implemented
UF0568 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $3,117 $9,240 Implemented
UF0568 # 06 Y:2021 06 2021 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $1,828 $0 Not Implemented